Description
IGF::OT::IGF - PROJECT 676-14-049 AT THE TOMAH VAMC IN TOMHA, WI INCLUDES THE FOLLOWING: 1.) REMOVE BLACKTOP ASPHALT, EXCAVATE AND REMOVE FILL FROM SANITARY MAIN PIPE TRENCH. THIS IS APPROXIMATELY 360 FEET. THIS IS FROM THE SEWER MANHOLE, ACROSS 3RD STREET AND UP TO THE LIFT STATION. 2) PROVIDE STEEL DRIVE OVER PLATES ACROSS EACH TRENCH TO FACILITATE VEHICLE TRAFFIC TO PASS THROUGH THE SITE AREA. PROVIDE TRAFFIC CONTROL TO ALLOW DELIVERY TRUCKS INTO P-7 AND NORMAL VEHICLE TRAFFIC PATTERN. 3) REMOVE EXISTING POLY INSULATION. 4)REMOVE EXISTING BEDDING MATERIAL. 5) REMOVE THE 2 INCH PVC MAIN PIPING FROM THE MANHOLE DROP UP TO THE TANK OUTLET PIPING WITHIN MINIMAL AREA WITHOUT DISTURBING THE CONCRETE PAD OR LIFT STATION TANK FILL AREA. 6)INSTALL A 2 INCH TO 3 INCH PVC ADAPTER AND NEW 3 INCH PVC DRAIN PIPE THE ENTIRE LENGTH. 7) INSTALL LIGHTWEIGHT AIR ENTRAINED INSULATING CONCRETE AS PER SITE PLAN. 8)INSTALL 2.5 INCH THICK EXTRUDED POLYSTYRENE INSULATION AS PER SITE PLAN. 9) INSTALL BEDDING MATERIAL AND BACKFILL. PROVIDE COMPACTION OF MATERIAL AS REQUIRED. 10) INSTALL BLACKTOP ASPHALT TOPPING AS REMOVED PER SITE PLAN. 11)PROVIDE INSPECTION REPORT AND AS BUILT DRAWINGS AS REQUIRED. MOD-P0003 INCORPORATES A 53 DAY TIME EXTENSION AND A ($1,553) CREDIT FOR DELETED ASPHALT PAVING.
Base award description: IGF::OT::IGF - PROJECT 676-14-049 AT THE TOMAH VAMC IN TOMHA, WI INCLUDES THE FOLLOWING: 1.) REMOVE BLACKTOP ASPHALT, EXCAVATE AND REMOVE FILL FROM SANITARY MAIN PIPE TRENCH. THIS IS APPROXIMATELY 360 FEET. THIS IS FROM THE SEWER MANHOLE, ACROSS 3RD STREET AND UP TO THE LIFT STATION. 2) PROVIDE STEEL DRIVE OVER PLATES ACROSS EACH TRENCH TO FACILITATE VEHICLE TRAFFIC TO PASS THROUGH THE SITE AREA. PROVIDE TRAFFIC CONTROL TO ALLOW DELIVERY TRUCKS INTO P-7 AND NORMAL VEHICLE TRAFFIC PATTERN. 3) REMOVE EXISTING POLY INSULATION. 4)REMOVE EXISTING BEDDING MATERIAL. 5) REMOVE THE 2 INCH PVC MAIN PIPING FROM THE MANHOLE DROP UP TO THE TANK OUTLET PIPING WITHIN MINIMAL AREA WITHOUT DISTURBING THE CONCRETE PAD OR LIFT STATION TANK FILL AREA. 6)INSTALL A 2 INCH TO 3 INCH PVC ADAPTER AND NEW 3 INCH PVC DRAIN PIPE THE ENTIRE LENGTH. 7) INSTALL LIGHTWEIGHT AIR ENTRAINED INSULATING CONCRETE AS PER SITE PLAN. 8)INSTALL 2.5 INCH THICK EXTRUDED POLYSTYRENE INSULATION AS PER SITE PLAN. 9) INSTALL BEDDING MATERIAL AND BACKFILL. PROVIDE COMPACTION OF MATERIAL AS REQUIRED. 10) INSTALL BLACKTOP ASPHALT TOPPING AS REMOVED PER SITE PLAN. 11)PROVIDE INSPECTION REPORT AND AS BUILT DRAWINGS AS REQUIRED.
Modification chain · 4 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2014-11-04+$56,459= $56,459
- Mod P000012014-12-18+$0= $56,459
- Mod P000022014-12-30+$0= $56,459
- Mod P000032015-07-20-$1,553= $54,906
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2014-11-04 | +$56,459 | $56,459 | IGF::OT::IGF - PROJECT 676-14-049 AT THE TOMAH VAMC IN TOMHA, WI INCLUDES THE FOLLOWING: 1.) REMOVE BLACKTOP A… |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-12-18 | +$0 | $56,459 | IGF::OT::IGF - PROJECT 676-14-049 AT THE TOMAH VAMC IN TOMHA, WI INCLUDES THE FOLLOWING: 1.) REMOVE BLACKTOP A… |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-12-30 | +$0 | $56,459 | IGF::OT::IGF - PROJECT 676-14-049 AT THE TOMAH VAMC IN TOMHA, WI INCLUDES THE FOLLOWING: 1.) REMOVE BLACKTOP A… |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-20 | −$1,553 | $54,906 | IGF::OT::IGF - PROJECT 676-14-049 AT THE TOMAH VAMC IN TOMHA, WI INCLUDES THE FOLLOWING: 1.) REMOVE BLACKTOP A… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI REHKBNGG2K84)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA69D15D0138 | 69D-NETWORK CONTRACT OFFICE 12 · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES | $0 | FY2015 |
| VA69D15J2159 | 69D-NETWORK CONTRACT OFFICE 12 · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES | $2,000 | FY2015 |
| VA69D15J2151 | 69D-NETWORK CONTRACT OFFICE 12 · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES | $289,000 | FY2015 |
| VA69D14C0268 | 69D-NETWORK CONTRACT OFFICE 12 · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES | $1,884,378 | FY2014 |
| VA69D14C0247 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $1,320,554 | FY2014 |
| VA69D14C0212 | 69D-NETWORK CONTRACT OFFICE 12 · Z1DZ · MAINTENANCE OF OTHER HOSPITAL BUILDINGS | $494,346 | FY2014 |
Other recipients under Z1DZ from 69D-NETWORK CONTRACT OFFICE 12 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA69D16J2920 | RHI LLC | 69D-NETWORK CONTRACT OFFICE 12 | $6,200 | FY2016 |
| VA69D16J1763 | C3T, INC. | 69D-NETWORK CONTRACT OFFICE 12 | $4,206 | FY2016 |
| VA69D15J5623 | OPCON, INC. | 69D-NETWORK CONTRACT OFFICE 12 | $178,450 | FY2015 |
| VA69D15J4736 | C3T, INC. | 69D-NETWORK CONTRACT OFFICE 12 | $71,959 | FY2015 |
| VA69D15J4695 | C3T, INC. | 69D-NETWORK CONTRACT OFFICE 12 | $32,463 | FY2015 |