IGF::OT::IGF - PROJECT 676-323 CONSTRUCT RECREATION THERAPY BUILDING: CONTRACTOR SHALL PROVIDE LABOR, MATERIAL AND EQUIPMENT NECESSARY TO ACCOMPLISH THE FOLLOWING WORK, WHICH IS LOCATED ADJACENT TO BUILDINGS 406&452, IN ACCORDANCE WITH PROJECT DRAWINGS AND SPECIFICATIONS. A. THIS PROJECT WILL CONSTRUCT APPROX. 14,570 SF OF NEW SPACE FOR RECREATION THERAPY DEPARTMENT AND 1,130 SF FOR MECHANICAL SPACE FOR A TOTAL OF 15,700SF. B. THIS PROJECT WILL ALSO INCLUDE THE INSTALLATION OF MECHANICAL, ELECTRICAL AND PLUMBING SYSTEMS AS NECESSARY TO SUPPORT THE BUILDING AND CONNECT TO THE MEDICAL CENTER ELECTRICAL, GEOTHERMAL, WATER, SEWER AND DATA SYSTEMS. C. SITE WORK WILL BE REQUIRED INCLUDING ASPHALT PAVING, CONCRETE WORK AND LANDSCAPING. MOD-P00015 INCORPORATES A CREDIT FOR ACTUAL OVER-EXCAVATION REQUIREMENTS AND AN ADD FOR ROOF SNOW GUARDS AND PARKING LOT STRIPING.
Base award description: IGF::OT::IGF - PROJECT 676-323 CONSTRUCT RECREATION THERAPY BUILDING: CONTRACTOR SHALL PROVIDE LABOR, MATERIAL AND EQUIPMENT NECESSARY TO ACCOMPLISH THE FOLLOWING WORK, WHICH IS LOCATED ADJACENT TO BUILDINGS 406&452, IN ACCORDANCE WITH PROJECT DRAWINGS AND SPECIFICATIONS. A. THIS PROJECT WILL CONSTRUCT APPROX. 14,570 SF OF NEW SPACE FOR RECREATION THERAPY DEPARTMENT AND 1,130 SF FOR MECHANICAL SPACE FOR A TOTAL OF 15,700SF. B. THIS PROJECT WILL ALSO INCLUDE THE INSTALLATION OF MECHANICAL, ELECTRICAL AND PLUMBING SYSTEMS AS NECESSARY TO SUPPORT THE BUILDING AND CONNECT TO THE MEDICAL CENTER ELECTRICAL, GEOTHERMAL, WATER, SEWER AND DATA SYSTEMS. C. SITE WORK WILL BE REQUIRED INCLUDING ASPHALT PAVING, CONCRETE WORK AND LANDSCAPING.
Modification chain · 16 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2014-07-28+$4,378,117= $4,378,117
- Mod P000022015-05-11+$3,467= $4,381,584
- Mod P00012015-05-11+$7,048= $4,388,632
- Mod P000032015-05-26+$17,548= $4,406,180
- Mod P000042015-07-09+$59,567= $4,465,747
- Mod P000052015-09-01+$83,176= $4,548,923
- Mod P000062015-09-18+$60,372= $4,609,295
- Mod P000072015-10-07+$52,908= $4,662,203
- Mod P000082015-10-23+$55,863= $4,718,066
- Mod P000092015-10-25+$18,149= $4,736,215
- Mod P000102015-12-09+$26,013= $4,762,228
- Mod P000112015-12-09+$49,689= $4,811,917
- Mod P000122016-01-13+$33,948= $4,845,865
- Mod P000132016-01-26+$16,422= $4,862,287
- Mod P000142016-04-21+$0= $4,862,287
- Mod P000152016-06-14-$3,328= $4,858,959
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2014-07-28 | +$4,378,117 | $4,378,117 | IGF::OT::IGF - PROJECT 676-323 CONSTRUCT RECREATION THERAPY BUILDING: CONTRACTOR SHALL PROVIDE LABOR, MATERIAL… |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-11 | +$3,467 | $4,381,584 | IGF::OT::IGF - PROJECT 676-323 CONSTRUCT RECREATION THERAPY BUILDING: CONTRACTOR SHALL PROVIDE LABOR, MATERIAL… |
| Mod P0001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-11 | +$7,048 | $4,388,632 | IGF::OT::IGF - PROJECT 676-323 CONSTRUCT RECREATION THERAPY BUILDING: CONTRACTOR SHALL PROVIDE LABOR, MATERIAL… |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-26 | +$17,548 | $4,406,180 | IGF::OT::IGF - PROJECT 676-323 CONSTRUCT RECREATION THERAPY BUILDING: CONTRACTOR SHALL PROVIDE LABOR, MATERIAL… |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-09 | +$59,567 | $4,465,747 | IGF::OT::IGF - PROJECT 676-323 CONSTRUCT RECREATION THERAPY BUILDING: CONTRACTOR SHALL PROVIDE LABOR, MATERIAL… |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-01 | +$83,176 | $4,548,923 | IGF::OT::IGF - PROJECT 676-323 CONSTRUCT RECREATION THERAPY BUILDING: CONTRACTOR SHALL PROVIDE LABOR, MATERIAL… |
| Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-18 | +$60,372 | $4,609,295 | IGF::OT::IGF - PROJECT 676-323 CONSTRUCT RECREATION THERAPY BUILDING: CONTRACTOR SHALL PROVIDE LABOR, MATERIAL… |
| Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-07 | +$52,908 | $4,662,203 | IGF::OT::IGF - PROJECT 676-323 CONSTRUCT RECREATION THERAPY BUILDING: CONTRACTOR SHALL PROVIDE LABOR, MATERIAL… |
| Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-23 | +$55,863 | $4,718,066 | IGF::OT::IGF - PROJECT 676-323 CONSTRUCT RECREATION THERAPY BUILDING: CONTRACTOR SHALL PROVIDE LABOR, MATERIAL… |
| Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-10-25 | +$18,149 | $4,736,215 | IGF::OT::IGF - PROJECT 676-323 CONSTRUCT RECREATION THERAPY BUILDING: CONTRACTOR SHALL PROVIDE LABOR, MATERIAL… |
| Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-09 | +$26,013 | $4,762,228 | IGF::OT::IGF - PROJECT 676-323 CONSTRUCT RECREATION THERAPY BUILDING: CONTRACTOR SHALL PROVIDE LABOR, MATERIAL… |
| Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-12-09 | +$49,689 | $4,811,917 | IGF::OT::IGF - PROJECT 676-323 CONSTRUCT RECREATION THERAPY BUILDING: CONTRACTOR SHALL PROVIDE LABOR, MATERIAL… |
| Mod P00012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-13 | +$33,948 | $4,845,865 | IGF::OT::IGF - PROJECT 676-323 CONSTRUCT RECREATION THERAPY BUILDING: CONTRACTOR SHALL PROVIDE LABOR, MATERIAL… |
| Mod P00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-26 | +$16,422 | $4,862,287 | IGF::OT::IGF - PROJECT 676-323 CONSTRUCT RECREATION THERAPY BUILDING: CONTRACTOR SHALL PROVIDE LABOR, MATERIAL… |
| Mod P00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-04-21 | +$0 | $4,862,287 | IGF::OT::IGF - PROJECT 676-323 CONSTRUCT RECREATION THERAPY BUILDING: CONTRACTOR SHALL PROVIDE LABOR, MATERIAL… |
| Mod P00015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-14 | −$3,328 | $4,858,959 | IGF::OT::IGF - PROJECT 676-323 CONSTRUCT RECREATION THERAPY BUILDING: CONTRACTOR SHALL PROVIDE LABOR, MATERIAL… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI SPAJKLTSHGR8)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C25221C0077 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · Z2JZ · REPAIR OR ALTERATION OF MISCELLANEOUS BUILDINGS | $447,543 | FY2021 |
| 36C25220P0530 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $9,555 | FY2020 |
| 36C25220C0088 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · J065 · MAINT/REPAIR/REBUILD OF EQUIPMENT- MEDICAL, DENTAL, AND VETERINARY EQUIPMENT AND SUPPLIES | $140,096 | FY2020 |
| 36C25220C0072 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · Z1DZ · MAINTENANCE OF OTHER HOSPITAL BUILDINGS | $1,410,857 | FY2020 |
| 36C25218C0245 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · Z1DZ · MAINTENANCE OF OTHER HOSPITAL BUILDINGS | $1,304,540 | FY2018 |
| 36C25218P4815 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · J041 · MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT | $4,300 | FY2018 |
Other recipients under Y1DA from 252-NETWORK CONTRACT OFFICE 12 (36C252) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C25225C0027 | TL SERVICES, INC. | 252-NETWORK CONTRACT OFFICE 12 (36C252) | $12,399 | FY2025 |
| 36C25225C0004 | VORTEX INDUSTRIES LLC | 252-NETWORK CONTRACT OFFICE 12 (36C252) | $24,581 | FY2025 |
| 36C25222N0327 | TROOP CONTRACTING INC | 252-NETWORK CONTRACT OFFICE 12 (36C252) | $1,457,672 | FY2022 |
| 36C25222C0023 | TROOP CONTRACTING INC | 252-NETWORK CONTRACT OFFICE 12 (36C252) | $4,205,450 | FY2022 |
| 36C25222N0123 | RICHARD GROUP LLC | 252-NETWORK CONTRACT OFFICE 12 (36C252) | $4,726,328 | FY2022 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA69D14C0251_3600_-NONE-_-NONE- · retrieved 2026-09-26.