REPLACE HANDICAP RAMP, STAIRS AND FRONT ENTRANCE BLDG. #17 DE-OBLIGATION OF EXPIRED FUNDS AT THE EDWARD HINES JR. VA HOSPITAL, HINES ILLINOIS. NO COST TIME EXTENSION TO COINCIDE WITH THE HANDICAP RAMP CONSTRUCTION.
Base award description: IGF::OT::IGF BASE IDIQ AE DESIGN CONTRACT FOR MECHANICAL, ELECTRICAL AND PLUMBING DESIGNS AT THE EDWARD HINES JR. VA HOSPITAL, HINES IL. INDIVIDUAL TASK ORDERS WILL BE NEGOTIATED/AWARDED AGAINST THE IDIQ CONTRACT.
Modification chain · 6 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2012-11-21+$77,934= $77,934
- Mod P000012012-11-27+$4,000= $81,934
- Mod P000022013-08-08+$2,500= $84,434
- Mod P000032018-11-08+$24,492= $108,926
- Mod P000042018-11-08-$13,434= $95,492
- Mod P000052019-06-07+$0= $95,492
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2012-11-21 | +$77,934 | $77,934 | IGF::OT::IGF BASE IDIQ AE DESIGN CONTRACT FOR MECHANICAL, ELECTRICAL AND PLUMBING DESIGNS AT THE EDWARD HINES… |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-11-27 | +$4,000 | $81,934 | TASK ORDER #7 FOR ADDITIONAL AE DESIGN SERVICES TO REPLACE HANDICAPPED RAMP, STAIRS, PORCHES BLDG. #17 AT THE… |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-08 | +$2,500 | $84,434 | SA #2 FOR ADDITIONAL AE DESIGN SERVICE - REPLACE HANDICAP RAMP, STAIRS AND FRONT ENTRANCE BLDG. #17 AT THE EDW… |
| Mod P00003· FUNDING ONLY ACTION | 2018-11-08 | +$24,492 | $108,926 | REPLACE HANDICAP RAMP, STAIRS AND FRONT ENTRANCE CONSTRUCTION PERIOD SERVICES AT BLDG 17 OBLIGATION OF FY 19'… |
| Mod P00004· FUNDING ONLY ACTION | 2018-11-08 | −$13,434 | $95,492 | REPLACE HANDICAP RAMP, STAIRS AND FRONT ENTRANCE BLDG. #17 DE-OBLIGATION OF EXPIRED FUNDS AT THE EDWARD HINES… |
| Mod P00005· OTHER ADMINISTRATIVE ACTION | 2019-06-07 | +$0 | $95,492 | REPLACE HANDICAP RAMP, STAIRS AND FRONT ENTRANCE BLDG. #17 DE-OBLIGATION OF EXPIRED FUNDS AT THE EDWARD HINES… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI CEGCQKRHNMJ8)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA69D15J2910 | 69D-NETWORK CONTRACT OFFICE 12 · C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING | $20,000 | FY2015 |
| VA69D14J5159 | 69D-NETWORK CONTRACT OFFICE 12 · C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING | $30,000 | FY2014 |
| VA69D13J4277 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING | $78,782 | FY2013 |
| VA69D13J4144 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING | $84,444 | FY2013 |
| VA69D13J4086 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING | $39,987 | FY2013 |
| VA69D13J3457 | 69D-NETWORK CONTRACT OFFICE 12 · C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING | $48,421 | FY2013 |
Other recipients under C214 from 252-NETWORK CONTRACT OFFICE 12 (36C252) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA69D16J3053 | PFB ARCHITECTS, LLC-CHICAGO | 252-NETWORK CONTRACT OFFICE 12 (36C252) | $110,904 | FY2016 |
| VA69D13C0324 | GEO BANCROFT ENGINEERING LLC | 252-NETWORK CONTRACT OFFICE 12 (36C252) | $1,785,399 | FY2014 |
| VA69D13C0249 | GEO BANCROFT ENGINEERING LLC | 252-NETWORK CONTRACT OFFICE 12 (36C252) | $555,473 | FY2013 |
| VA69D13D0223 | GEO BANCROFT ENGINEERING LLC | 252-NETWORK CONTRACT OFFICE 12 (36C252) | $799,624 | FY2013 |