Award recordCONTRACT

BLUE YONDER INC

PIID VA69D12C0127· VHA· 69D-NETWORK CONTRACT OFFICE 12· 5650 · ROOFING AND SIDING MATERIALS· FY2012· $2,079,026 net obligations· UEI PTSCYLWKCFK3· IL

Description

SA-1 1. CHANGE ORDER CO#1=A - DURING POWER WASHING TO REMOVE THE DIRT AND GRIME ON ALL THE EXISTING SEEMS OF THE TRAMWAY METAL ROOFING SYSTEM ISSUE WITH SEVERAL OF THE FACTORY SEEMS WERE UNCOVERED. THE RECOMMENDATION FROM THE MANUFACTURER OF THE ROOFING SYSTEM WAS TO CUT OUT THESE SEEMS APPROXIMATELY 6-10 ON EACH SIDE AND THE ENTIRE LENGTH. REPLACE UNDERLING INSULATION IF NECESSARY, INSTALL NEW METAL PATCH WITH BUTYL TAPE AT SEEM AND SECURED WITH SELF TAPPING SCREWS WITH A MAXIMUM SPACING OF 1-1/2 , A COATING OF SEALING MATERIAL (WHITE KNIGHT) SHALL BE APPLIED OVER THE ENTIRE PATCH. THIS IS THE SAME MATERIAL BEING USED TO COAT THE ENTIRE ROOF. THIS SHALL BE TAPERED SO NOT TO CREATE TOO LARGE OF A RISE THAT COULD BE A TRIP HAZARD. ADDITIONALLY THERE ARE AREAS OF THE TRAMWAY ROOF REQUIRING THE DRIP EDGE TO BE SECURED DUE TO UP LIFT FROM THE WIND. THIS SHALL BE ACCOMPLISHED WITH THE DRILLING AND INSTALLATION OF TAP CON SCREWED SECURED ON BOTH SIDES OF THE TRAMWAY. THESE AREAS ARE LIMITED TO ONLY A COUPLE SMALL LOCATIONS THAT WILL REQUIRE THE INSTALLATION OF APPROX 250-300 SCREWS, THESE SCREWS SHALL BE CAULKED TO COVER THE SCREW HEAD. THE COST FOR THIS ADDITIONAL WORK IS $40,382.50 2. CHANGE ORDER CO#2=B- WILL PROVIDE ALL THE LABOR, MATERIALS, TOOLS, EQUIPMENT, AND TRANSPORTATION SERVICES NECESSARY TO PERFORM AND COMPLETE IN A WORKMANLIKE MANNER ALL OF THE WORK REQUIRED IN CONNECTION WITH THE REPLACEMENT OF LOADING DOCK CANOPY ROOF. THE COST FOR THIS ADDITIONAL WORK IS $40,643.31

Base award description: GENERAL CONSTRUCTION: WORK AT BUILDINGS 134, 135, 187&CONNECTING CORRIDOR SYSTEM ARE INCLUDED IN THE BASE CONTRACT: WORK INCLUDES GENERAL CONSTRUCTION OF ROOFING REMOVAL AND REPLACEMENT. ALSO INCLUDED SHALL BE MINOR TUCK POINTING AND OR BRICK REPLACEMENT. ALL WORK SHALL BE AT THE JAMES A. LOVELL FHCC, 3001 GREEN BAY ROAD, NORTH CHICAGO, IL. 60064 PROJECT WILL BE BID AS BASE BID WITH 3 DEDUCTIVE ALTERNATES

First action · last action
2012-05-31 · 2012-09-13
Transactions
2
First transaction's obligation
$1,998,000
Base + all options value (sum of deltas)
$2,079,026
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
9
SDVOSB flag on record
Yes (self-representation)
NAICS
238160 · ROOFING CONTRACTORS

Modification chain · 2 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$2,079,026$0Base award · 2012-05-31 · this action $1,998,000 · running total $1,998,000Modification P00001 · 2012-09-13 · this action $81,026 · running total $2,079,026
  • Base2012-05-31+$1,998,000= $1,998,000
  • Mod P000012012-09-13+$81,026= $2,079,026
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2012-05-31+$1,998,000$1,998,000GENERAL CONSTRUCTION: WORK AT BUILDINGS 134, 135, 187&CONNECTING CORRIDOR SYSTEM ARE INCLUDED IN THE BASE CONT…
Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-13+$81,026$2,079,026SA-1 1. CHANGE ORDER CO#1=A - DURING POWER WASHING TO REMOVE THE DIRT AND GRIME ON ALL THE EXISTING SEEMS OF T…

Related awards · 8

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI PTSCYLWKCFK3)

AwardOffice · PSC / listingNet obligationsFY
36C77626C0072PCAC (36C776) · Y1BG · CONSTRUCTION OF ELECTRONIC AND COMMUNICATIONS FACILITIES$7,244,850FY2026
36C25226C0032252-NETWORK CONTRACT OFFICE 12 (36C252) · Z1DZ · MAINTENANCE OF OTHER HOSPITAL BUILDINGS$5,868,000FY2026
36C25225C0056252-NETWORK CONTRACT OFFICE 12 (36C252) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS$0FY2025
36S79725C0001NAC FACILITY PURCHASING SUPPORT (36S797) · Z2AA · REPAIR OR ALTERATION OF OFFICE BUILDINGS$189,760FY2025
36C25225C0016252-NETWORK CONTRACT OFFICE 12 (36C252) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES$4,099,865FY2025
36S79724C0002NAC FACILITY PURCHASING SUPPORT (36S797) · Y1AA · CONSTRUCTION OF OFFICE BUILDINGS$168,846FY2024

Other recipients under 5650 from 69D-NETWORK CONTRACT OFFICE 12 (most recent first)

AwardRecipientOfficeNet obligationsFY
VA69D12C0231CONSTRUCT SOLUTIONS, INC.69D-NETWORK CONTRACT OFFICE 12$786,102FY2012
VA69D12C0126INDUSTRIA INC69D-NETWORK CONTRACT OFFICE 12$0FY2012

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA69D12C0127_3600_-NONE-_-NONE- · retrieved 2026-09-26.