Award recordCONTRACT

PFB ARCHITECTS, LLC-CHICAGO

PIID VA69D12C0075· VHA· 69D-NETWORK CONTRACT OFFICE 12· C1AA · ARCHITECT AND ENGINEERING- CONSTRUCTION: OFFICE BUILDINGS· FY2012· $856,979 net obligations· UEI LW7MKK9HMN26· IL

Description

IGF::OT::IGF S/A #2 FOR ADDITIONAL AE DESIGN SERVICES TO RELOCATE THE JOLIET CBOC TO SILVER CROSS FACILITY BLDG. #8 FOR THE EDWARD HINES JR. VA HOSPITAL, HINES ILLINOIS.

Base award description: IGF::OT::IGF AE DESIGN SERVICES TO RELOCATE THE JOLIET CBOC TO SILVER CROSS FACILITY BLDG. #8 FOR THE EDWARD HINES JR. VA HOSPITAL, HINES ILLINOIS.

First action · last action
2012-03-30 · 2014-02-24
Transactions
4
First transaction's obligation
$787,551
Base + all options value (sum of deltas)
$856,979
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SMALL BUSINESS SET ASIDE - TOTAL
Offers received
23
SDVOSB flag on record
No
NAICS
541310 · ARCHITECTURAL SERVICES

Modification chain · 4 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$856,979$0Base award · 2012-03-30 · this action $787,551 · running total $787,551Modification P00001 · 2012-09-20 · this action $6,848 · running total $794,399Modification P00002 · 2013-08-09 · this action $6,945 · running total $801,344Modification P00003 · 2014-02-24 · this action $55,635 · running total $856,979
  • Base2012-03-30+$787,551= $787,551
  • Mod P000012012-09-20+$6,848= $794,399
  • Mod P000022013-08-09+$6,945= $801,344
  • Mod P000032014-02-24+$55,635= $856,979
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2012-03-30+$787,551$787,551IGF::OT::IGF AE DESIGN SERVICES TO RELOCATE THE JOLIET CBOC TO SILVER CROSS FACILITY BLDG. #8 FOR THE EDWARD H…
Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-20+$6,848$794,399IGF::OT::IGF S/A #1 FOR ADDITIONAL AE DESIGN SERVICES TO RELOCATE THE JOLIET CBOC TO SILVER CROSS FACILITY BL…
Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-08-09+$6,945$801,344IGF::OT::IGF S/A #2 FOR ADDITIONAL AE DESIGN SERVICES TO RELOCATE THE JOLIET CBOC TO SILVER CROSS FACILITY BLD…
Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2014-02-24+$55,635$856,979IGF::OT::IGF S/A #2 FOR ADDITIONAL AE DESIGN SERVICES TO RELOCATE THE JOLIET CBOC TO SILVER CROSS FACILITY BLD…

Related awards · 6

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI LW7MKK9HMN26)

AwardOffice · PSC / listingNet obligationsFY
VA69D16J3053252-NETWORK CONTRACT OFFICE 12 (36C252) · C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING$110,904FY2016
VA69D16J3000252-NETWORK CONTRACT OFFICE 12 (36C252) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES$162,057FY2016
VA69D14P070269D-NETWORK CONTRACT OFFICE 12 · C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING$36,414FY2014
VA69D13J2915252-NETWORK CONTRACT OFFICE 12 (36C252) · C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING$24,467FY2013
VA69D13J3449252-NETWORK CONTRACT OFFICE 12 (36C252) · C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING$4,689FY2013
VA69D13J268969D-NETWORK CONTRACT OFFICE 12 · C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING$52,345FY2013

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA69D12C0075_3600_-NONE-_-NONE- · retrieved 2026-09-26.