Description
AE CORRECT ELECTRICAL DEFICIENCIES
First action · last action
2010-01-14 · 2010-01-21
Transactions
2
First transaction's obligation
$104,626
Base + all options value (sum of deltas)
$209,252
Extent competed
FULL AND OPEN COMPETITION
Other than full & open authority
—
Set-aside
NO SET ASIDE USED.
Offers received
7
SDVOSB flag on record
No
Parent IDV
VA247P0743
NAICS
541310 · ARCHITECTURAL SERVICES
Modification chain · 2 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2010-01-14+$104,626= $104,626
- Mod 12010-01-21+$0= $104,626
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2010-01-14 | +$104,626 | $104,626 | AE CORRECT ELECTRICAL DEFICIENCIES |
| Mod 1· OTHER ADMINISTRATIVE ACTION | 2010-01-21 | +$0 | $104,626 | AE CORRECT ELECTRICAL DEFICIENCIES |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI XJHFG7J6ZGC5)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA24713P1444 | 521-BIRMINGHAM · R425 · SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICAL | $23,200 | FY2013 |
| VA24713P1374 | 251-NETWORK CONTRACT OFFICE 11 · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $22,891 | FY2013 |
| VA24712J2863 | 679-TUSCALOOSA · C1FZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER RESIDENTIAL BUILDINGS | $374,246 | FY2012 |
| VA70112D0021 | PCAC NATIONAL ENERGY BUSINESS CENTER · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $0 | FY2012 |
| VA70112J0090 | PCAC NATIONAL ENERGY BUSINESS CENTER · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $2,500 | FY2012 |
| VA679Z10002 | 247-NETWORK CONTRACT OFFICE 7 (36C247) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $850,129 | FY2011 |
Other recipients under C211 from 247-NETWORK CONTRACT OFFICE 7 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA24716P0027 | TRENDWAY CORPORATION | 247-NETWORK CONTRACT OFFICE 7 | $0 | FY2016 |
| V247P2526 | WATSON TATE SAVORY LIOLLIO ARCHITECTURE, INC. | 247-NETWORK CONTRACT OFFICE 7 | -$1,081 | FY2014 |
| VA24712F2757 | TL SERVICES, INC. | 247-NETWORK CONTRACT OFFICE 7 | $2,095,744 | FY2012 |
| VA247P0157 | PINNACLE ENGINEERING INC | 247-NETWORK CONTRACT OFFICE 7 | $15,000 | FY2012 |
| VA247P1676 | TBB DESIGN & DEVELOPMENT, LLC | 247-NETWORK CONTRACT OFFICE 7 | $1,156,606 | FY2011 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA679C05085_3600_VA247P0743_3600 · retrieved 2026-09-26.