Description
MODIFICATION P04 TO REDESIGN BLDG 27 BASEMENT
Base award description: AE DESIGN SERVICES FOR AUDIOLOGY AND MENTAL HEALTH SPACE REMODEL
Modification chain · 5 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2010-01-25+$240,535= $240,535
- Mod 12010-06-02+$3,960= $244,495
- Mod P000022012-02-21+$1,081= $245,576
- Mod P000032012-03-05+$20,886= $266,463
- Mod P000042013-02-14+$6,888= $273,351
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2010-01-25 | +$240,535 | $240,535 | AE DESIGN SERVICES FOR AUDIOLOGY AND MENTAL HEALTH SPACE REMODEL |
| Mod 1· CHANGE ORDER | 2010-06-02 | +$3,960 | $244,495 | MODIFICATION 01 FOR IN SCOPE CHANGE TO ADD REQUIREMENT FOR TOPOGRAPHICAL SURVEYS. |
| Mod P00002· CHANGE ORDER | 2012-02-21 | +$1,081 | $245,576 | MODIFICATION P02 FOR ADDITIONAL SURVEY WORK |
| Mod P00003· CHANGE ORDER | 2012-03-05 | +$20,886 | $266,463 | MODIFICATION 01 FOR IN SCOPE CHANGE TO ADD REQUIREMENT FOR TOPOGRAPHICAL SURVEYS. |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-14 | +$6,888 | $273,351 | MODIFICATION P04 TO REDESIGN BLDG 27 BASEMENT |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI Q294PDMLHLQ5)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C26019P0462 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $52,483 | FY2019 |
| VA26014J0585 | 260-NETWORK CONTRACT OFFICE 20 · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $50,993 | FY2014 |
| VA26014J0256 | 260-NETWORK CONTRACT OFFICE 20 · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $33,817 | FY2014 |
| VA26013J1045 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $447,143 | FY2013 |
| VA26013J0651 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $600,979 | FY2013 |
| VA26013J0419 | 260-NETWORK CONTRACT OFFICE 20 · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $47,379 | FY2013 |
Other recipients under C211 from 260-NETWORK CONTRACT OFFICE 20 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA26016J0687 | KMB ARCHITECTS, INC., P.S. | 260-NETWORK CONTRACT OFFICE 20 | $270,336 | FY2016 |
| VA26016J0467 | HDR ARCHITECTURE, INC | 260-NETWORK CONTRACT OFFICE 20 | $93,445 | FY2016 |
| VA26015J4514 | ZGA ARCHITECTS AND PLANNERS, CHARTERED | 260-NETWORK CONTRACT OFFICE 20 | $7,160 | FY2015 |
| VA26015J1225 | WILLIAM WILSON ARCHITECTS P.C. | 260-NETWORK CONTRACT OFFICE 20 | $36,694 | FY2015 |
| VA26014J0881 | OH PLANNING + DESIGN, ARCHITECTURE, P.C. | 260-NETWORK CONTRACT OFFICE 20 | $145,000 | FY2014 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA668C01650_3600_VA260P0567_3600 · retrieved 2026-09-26.