Description
THE WORK CONSISTS OF ALL LABOR, EQUIPMENT, MATERIALS, ACCESSORIES, SUPERVISION, AND ALL OPERATIONS REQUIRED, FOR THE CLEARING, TREE REMOVAL AND ASSOCIATED WORK TO CONSTRUCT APPROXIMATELY 3000 LINEAL FEET OF 12 FOOT WIDE UTILITY VEHICLE PATH 1400 LINEAL FEET OF 6 FOOT WIDE MAINTENANCE PATH ALONG EXISTING FENCE AND 300 LINEAL FEET OF 25 FOOT WIDE UTILITY PATH FOR NEW FENCE AS LOCATED ON DRAWINGS. WORK TO INCLUDE CLEARING OF BRUSH, VEGETATION, DOWN TREES IN PATHS, TREE REMOVAL IN PATHS, REMOVAL OF EXISTING BAR WIRE 3 ROWS FROM APPROXIMATELY 1800 LF OF EXISTING FENCE, REMOVE 12 FOOT SECTION OF EXISTING STONE WALL, CLEAR/REMOVE ALL GROWTH FROM FENCE, REPLACE APPROXIMATELY 300 LINEAL FEET OF 6 FOOT HIGH VINYL COATED CHAIN LINK MESH FABRIC AND TOP AND BOTTOM WIRES, FURNISH AND INSTALL APPROXIMATELY 300 LINEAL FEET OF 6 FOOT HIGH NEW VINYL COATED CHAIN LINK FENCE ,POSTS TOP RAIL BOTTOM WIRE WITH ACCESSORIES AND POST SET IN CONCRETE FOOTINGS. 2. CONTRACTOR SHALL DISPOSE OF WOOD AND CHIPPED MATERIALS SPREAD IN LEVEL BLANKET OVER THE PATH WIDTH FOR A DRIVING SURFACE. 3. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR, PRIOR TO BIDDING THIS JOB, TO INSPECT THE WORK SITE, DETERMINE THE QUANTITY OF WORK INVOLVED, CHECK DIMENSIONS, COMPARE THE SPECIFICATIONS WITH THE WORK TO BE DONE, AND INFORM THEMSELVES AS TO ALL EXISTING SITE CONDITIONS. FAILURE TO DO SO WILL IN NO WAY RELIEVE THE SUCCESSFUL CONTRACTOR FROM WORK THAT MAY BE REQUIRED TO CARRY OUT THE TERMS OF THIS CONTRACT IN ACCORDANCE WITH THE TRUE INTENT AND MEANING OF THE PLANS, WITHOUT ADDITIONAL COST TO THE OWNER.
Modification chain · 1 transaction
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2010-03-15+$167,900= $167,900
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2010-03-15 | +$167,900 | $167,900 | THE WORK CONSISTS OF ALL LABOR, EQUIPMENT, MATERIALS, ACCESSORIES, SUPERVISION, AND ALL OPERATIONS REQUIRED, F… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI M6DYB8PSFFY5)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA25116J0006 | 550-DANVILLE(00550) · S222 · HOUSEKEEPING- WASTE TREATMENT/STORAGE | $60,187 | FY2016 |
| VA25114J2769 | 550-DANVILLE · S222 · HOUSEKEEPING- WASTE TREATMENT/STORAGE | $119,441 | FY2015 |
| VA25114J3572 | 550-DANVILLE · S222 · HOUSEKEEPING- WASTE TREATMENT/STORAGE | $112,323 | FY2014 |
| VA25112J2779 | 550-DANVILLE · S222 · HOUSEKEEPING- WASTE TREATMENT/STORAGE | $123,829 | FY2013 |
| VA550C27009 | 550-DANVILLE · S222 · HOUSEKEEPING- WASTE TREATMENT/STORAGE | $65,936 | FY2012 |
| VA620C10300 | 243-NETWORK CONTRACTING OFFICE 03 · C114 · HOSPITAL BUILDINGS | $25,439 | FY2011 |
Other recipients under Y111 from 243-NETWORK CONTRACTING OFFICE 03 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA630C11394 | CONCENTRIC GROUP, LLC | 243-NETWORK CONTRACTING OFFICE 03 | $190,666 | FY2011 |
| VA243C1207 | CONCENTRIC GROUP, LLC | 243-NETWORK CONTRACTING OFFICE 03 | $7,761,181 | FY2011 |
| VA243C1186 | GCC ENTERPRISES INC. | 243-NETWORK CONTRACTING OFFICE 03 | $2,497,000 | FY2011 |
| VA630C11413 | REGIMENT CONSTRUCTION CORP | 243-NETWORK CONTRACTING OFFICE 03 | $70,260 | FY2011 |
| VA630C11414 | REGIMENT CONSTRUCTION CORP | 243-NETWORK CONTRACTING OFFICE 03 | $31,500 | FY2011 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA62C00374_3600_VA243C0709_3600 · retrieved 2026-09-27.