Description
THIS IS AN ADMINISTRATIVE MOD FOR CONTINUED CPS
Base award description: ARCHITECT AND ENGINEERING SERVICES FOR VISN 3. DESIGN TUCKPOINT FOR HUDSON VALLEY MONTROSE CAMPUS BUILDINGS 1,3, AND 5.
Modification chain · 6 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2011-09-28+$268,770= $268,770
- Mod 12012-05-10-$40,719= $228,051
- Mod P000022013-01-15+$10,926= $238,977
- Mod P000042016-03-04+$0= $238,977
- Mod P000052016-09-23-$7,328= $231,649
- Mod P000062020-06-11+$0= $231,649
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2011-09-28 | +$268,770 | $268,770 | ARCHITECT AND ENGINEERING SERVICES FOR VISN 3. DESIGN TUCKPOINT FOR HUDSON VALLEY MONTROSE CAMPUS BUILDINGS 1,… |
| Mod 1· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-05-10 | −$40,719 | $228,051 | BUILDING 5 IS BEEING REMOVED FROM THE SCOPE OF WORK AND PCB TEST HAS BEEN ADDED TO THE SCOPE OF WORK. |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-01-15 | +$10,926 | $238,977 | THIS MODIFICATION IS FOR PCB TESTING |
| Mod P00004· OTHER ADMINISTRATIVE ACTION | 2016-03-04 | +$0 | $238,977 | THIS IS AN ADMINISTRATIVE MOD FOR CONTINUED CPS |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-09-23 | −$7,328 | $231,649 | THIS IS AN ADMINISTRATIVE MOD FOR CONTINUED CPS |
| Mod P00006· OTHER ADMINISTRATIVE ACTION | 2020-06-11 | +$0 | $231,649 | THIS IS AN ADMINISTRATIVE MOD FOR CONTINUED CPS |
Related awards · 9
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI MTL5LBUL3VL7)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24219C0149 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $27,569 | FY2019 |
| 36C24218C0158 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · C1DZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS | $2,357 | FY2018 |
| VA24116P2231 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $46,960 | FY2016 |
| VA24216C0162 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $45,049 | FY2016 |
| VA24314C0220 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · C212 · ARCHITECT AND ENGINEERING- GENERAL: ENGINEERING DRAFTING, NOT CAD/CAM | $183,935 | FY2014 |
| VA24313C0109 | 243-NETWORK CONTRACTING OFFICE 03 · R428 · SUPPORT- PROFESSIONAL: INDUSTRIAL HYGIENICS | $133,476 | FY2014 |
Other recipients under C214 from 242-NETWORK CONTRACT OFFICE 02 (36C242) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C24218P0522 | NOLTE, RONALD J | 242-NETWORK CONTRACT OFFICE 02 (36C242) | $9,600 | FY2018 |
| VA52812C0161 | AE WORKS LTD | 242-NETWORK CONTRACT OFFICE 02 (36C242) | $157,582 | FY2012 |
| VA630C11325 | FELLENZER ENGINEERING LLP | 242-NETWORK CONTRACT OFFICE 02 (36C242) | $54,635 | FY2011 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA620C10370_3600_VA243P0224_3600 · retrieved 2026-09-26.