Award recordCONTRACT

2H&V CONSTRUCTION SERVICES, LLC

PIID VA619C15259· VHA· 619-CENTRAL ALABAMA· N062 · INSTALL OF LIGHTING FIXTURES· FY2011· $18,292 net obligations· UEI JM6EATAHBEL6· FL

Description

THE CONTRACTOR WILL PROVIDE ALL LABOR AND MATERIALS TO RENOVATE AN EXISTING STAIRWELL IN BLDG. 68 BY MEANS OF CEILING TILE REPLACEMENTS, A NEW SUSPENDED CEILING INSTALLATION, LIGHT FIXTURE MODIFICATION, STAIR WAY TREAD TILE REPLACELENTS, AND THE PAINTING OF DOORS,WALLS, WINDOW SILLS AND STAIRS. CEILING TILES 1728A AND PAINT CEILING GRIDS WITH OIL BASE PAINT (WHITE). SHEETROCK AMY WALLS THAT ARE PLASTER, DAMAGE FROM THE STEAM LEAK OR MILDEW. REPLACE ALL TREADMILL (STEPS), PAINT ALL FLOOR LANDINGS. DROP SPRINKLERS HEADS TO FIT FOR NEW FROP CEILING. REPLACE LIGHT FIXTURES WITH NEW 2X2 LIGHT FIXTURES. PREP ALL WALLS AND ANY NEW SHEETROCK WALL. (MUD, SAND AND PRIME). PRIME AND PAINT WALLS, HANDRAILS, DOOR FRAMES, PIPE AND WINDOW SILLS. PREP, SAND AND VARNISH EXISTING WOODEN DOORS. PAINT ALL METAL EXISTING DOORS WITH OIL BASE PAINT.

First action · last action
2011-04-27 · 2011-04-27
Transactions
1
First transaction's obligation
$18,292
Base + all options value (sum of deltas)
$18,292
Extent competed
COMPETED UNDER SAP
Other than full & open authority
—
Set-aside
NO SET ASIDE USED.
Offers received
1
SDVOSB flag on record
Yes (self-representation)
NAICS
238210 · ELECTRICAL CONTRACTORS AND OTHER WIRING INSTALLATION CONTRACTORS

Modification chain · 1 transaction

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$18,292$0Base award · 2011-04-27 · this action $18,292 · running total $18,292
  • Base2011-04-27+$18,292= $18,292
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2011-04-27+$18,292$18,292THE CONTRACTOR WILL PROVIDE ALL LABOR AND MATERIALS TO RENOVATE AN EXISTING STAIRWELL IN BLDG. 68 BY MEANS OF…

Related awards · 8

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI JM6EATAHBEL6)

AwardOffice · PSC / listingNet obligationsFY
36C24726C0051247-NETWORK CONTRACT OFFICE 7 (36C247) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES$271,550FY2026
36C24826C0028248-NETWORK CONTRACT OFFICE 8 (36C248) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES$1,208,143FY2026
36C24826C0004248-NETWORK CONTRACT OFFICE 8 (36C248) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES$1,295,008FY2026
36C25626N0344256-NETWORK CONTRACT OFFICE 16 (36C256) · Z2DZ · REPAIR OR ALTERATION OF OTHER HOSPITAL BUILDINGS$7,015,631FY2026
36C25624C0089256-NETWORK CONTRACT OFFICE 16 (36C256) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES$1,573,624FY2024
36C24924C0006249-NETWORK CONTRACT OFFICE 9 (36C249) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS$737,982FY2024

Other recipients under N062 from 619-CENTRAL ALABAMA (most recent first)

AwardRecipientOfficeNet obligationsFY
VA619C95385JOHNSON CONTROLS, INC619-CENTRAL ALABAMA$114,810FY2009
V619C95384YEARGAN CONSTRUCTION COMPANY LLC619-CENTRAL ALABAMA$6,203FY2009

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA619C15259_3600_-NONE-_-NONE- · retrieved 2026-09-26.