Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2011-09-09+$211,718= $211,718
- Mod P000012012-09-07+$0= $211,718
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2011-09-09 | +$211,718 | $211,718 | ARCHITECT ENGINEER SERVICE PROJECT 549-07-107 CANTEEN RENOVATION |
| Mod P00001· CHANGE ORDER | 2012-09-07 | +$0 | $211,718 | CANTEEN RENOVATION PROJECT 549-07-107 AE MOD 1 - EXTEND THE POP |
Related awards · 6
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI VENTDQ4KKC96)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA25716C0137 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $48,746 | FY2016 |
| VA25716C0085 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · C1PB · ARCHITECT AND ENGINEERING- CONSTRUCTION: EXHIBIT DESIGN (NON-BUILDING) | $44,182 | FY2016 |
| VA25715C0182 | 257-NETWORK CONTRACT OFFICE 17 · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $148,916 | FY2015 |
| VA25715C0171 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $159,304 | FY2015 |
| VA25715C0166 | 257-NETWORK CONTRACT OFFICE 17 · C215 · ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | $23,641 | FY2015 |
| VA25715C0106 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $2,541 | FY2015 |