Description
PHASE 1 AND 2 VISN 3 ENERGY ASSESSMENTS WITH OPTION OF PHASE 3
Base award description: ENERGY ASSESMENT VISN 3
Modification chain · 3 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2008-09-23+$708,001= $708,001
- Mod SA12009-08-27+$0= $708,001
- Mod SA22009-09-28+$0= $708,001
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2008-09-23 | +$708,001 | $708,001 | ENERGY ASSESMENT VISN 3 |
| Mod SA1· OTHER ADMINISTRATIVE ACTION | 2009-08-27 | +$0 | $708,001 | PHASE 1 AND 2 VISN 3 ENERGY ASSESSMENTS WITH OPTION OF PHASE 3 |
| Mod SA2· EXERCISE AN OPTION | 2009-09-28 | +$0 | $708,001 | PHASE 1 AND 2 VISN 3 ENERGY ASSESSMENTS WITH OPTION OF PHASE 3 |
Related awards · 9
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI LJJ6DGARYF48)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA69D14J0124 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $143,665 | FY2014 |
| VA69D13J1724 | 69D-NETWORK CONTRACT OFFICE 12 · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $10,000 | FY2013 |
| VA69D13J0520 | 69D-NETWORK CONTRACT OFFICE 12 · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $80,605 | FY2013 |
| VA69D12J2152 | 69D-NETWORK CONTRACT OFFICE 12 · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $159,643 | FY2012 |
| VA69D12J1739 | 69D-NETWORK CONTRACT OFFICE 12 · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $27,600 | FY2012 |
| VA69D12J1755 | 69D-NETWORK CONTRACT OFFICE 12 · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $133,812 | FY2012 |
Other recipients under B513 from PCAC HEALTH INFORMATION TECHNOLOGY SERVICES (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA101S17062 | GARTNER, INC. | PCAC HEALTH INFORMATION TECHNOLOGY SERVICES | $251,194 | FY2011 |
| VA101C95109 | NOVI ENERGY LLC | PCAC HEALTH INFORMATION TECHNOLOGY SERVICES | $25,754 | FY2009 |
| VA541C90414 | TETRA TECH INC | PCAC HEALTH INFORMATION TECHNOLOGY SERVICES | $104,509 | FY2009 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA541C80696_3600_GS00F0004M_4730 · retrieved 2026-09-26.