Description
SUPPLEMENTAL AGREEMENT TO PROVIDE FOR WITHIN SCOPE CHANGES TO HE A/E DESIGN CONTRACT FOR PROJECT 541-11-103 REPLACE FIRST FLOOR ROOF AT THE LOUIS STOKES VAMC CLEVELAND OHIO.
Base award description: THE PROJECT SHALL INCLUDE REPLACEMENT OF APPROXIMATELY 65,000SF OF ROOF AREA COVERING FIRST FLOOR SPACE
Modification chain · 5 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2010-03-31+$49,876= $49,876
- Mod 12010-07-07+$34,381= $84,257
- Mod 22010-07-23+$0= $84,257
- Mod 32010-09-18+$0= $84,257
- Mod P000042013-02-26+$5,060= $89,317
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2010-03-31 | +$49,876 | $49,876 | THE PROJECT SHALL INCLUDE REPLACEMENT OF APPROXIMATELY 65,000SF OF ROOF AREA COVERING FIRST FLOOR SPACE |
| Mod 1· CHANGE ORDER | 2010-07-07 | +$34,381 | $84,257 | REVISED AE DESIGN FEEL IN THE AMOUNT OF $34,381 |
| Mod 2· CHANGE ORDER | 2010-07-23 | +$0 | $84,257 | THIS IS A MODIFICATION TO CHANGE THE END DATE FOR DESIGN SUBMITTAL FROM 7/31/10 TO 10/31/10 |
| Mod 3· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-18 | +$0 | $84,257 | AE IDIQ $0-$50,000 AWARDED TO MAKOVICH AND PUSTI THIS IS A TIME EXTENSION OF APPROXIMATELY 30 DAYS WHICH IS TH… |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-02-26 | +$5,060 | $89,317 | SUPPLEMENTAL AGREEMENT TO PROVIDE FOR WITHIN SCOPE CHANGES TO HE A/E DESIGN CONTRACT FOR PROJECT 541-11-103 RE… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI PYAMKHX8YHA1)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA25014C0044 | 250-NETWORK CONTRACT OFFICE 10 · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $25,609 | FY2014 |
| VA25013C0151 | 541-BRECKSVILLE · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $22,857 | FY2013 |
| VA25014C0007 | 541-BRECKSVILLE · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $22,857 | FY2013 |
| VA25013P1537 | 541-BRECKSVILLE · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $22,857 | FY2013 |
| VA25013C0143 | 250-NETWORK CONTRACT OFFICE 10 (36C250) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $145,460 | FY2013 |
| VA25013J0801 | 541-BRECKSVILLE · C1JZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: MISCELLANEOUS BUILDINGS | $16,577 | FY2013 |
Other recipients under C211 from 541-BRECKSVILLE (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA25014J3053 | CHAMPLIN/HAUPT ARCHITECTS INC | 541-BRECKSVILLE | $19,400 | FY2014 |
| VA25013J2108 | CBLH DESIGN INC | 541-BRECKSVILLE | $0 | FY2013 |
| VA25013J2025 | FREDRICK, FREDRICK & HELLER ENGINEERS INC | 541-BRECKSVILLE | $59,576 | FY2013 |
| VA25013J1860 | FREDRICK, FREDRICK & HELLER ENGINEERS INC | 541-BRECKSVILLE | $8,198 | FY2013 |
| VA25013J1678 | FREDRICK, FREDRICK & HELLER ENGINEERS INC | 541-BRECKSVILLE | $18,700 | FY2013 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA541C02024_3600_VA250P0456_3600 · retrieved 2026-09-26.