Description
BOILER SAFETY INSPECTION
First action · last action
2009-09-22 · 2009-09-22
Transactions
1
First transaction's obligation
$4,860
Base + all options value (sum of deltas)
$4,860
Extent competed
NOT COMPETED UNDER SAP
Other than full & open authority
SAP NON-COMPETITION
Set-aside
NO SET ASIDE USED.
Offers received
1
SDVOSB flag on record
No
NAICS
541990 · ALL OTHER PROFESSIONAL, SCIENTIFIC, AND TECHNICAL SERVICES
Modification chain · 1 transaction
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2009-09-22+$4,860= $4,860
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2009-09-22 | +$4,860 | $4,860 | BOILER SAFETY INSPECTION |
Related awards · 7
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI TL45LLUKSLW3)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24622P0903 | 246-NETWORK CONTRACTING OFFICE 6 (36C246) · H999 · OTHER QC/TEST/INSPECT- MISCELLANEOUS | $23,500 | FY2022 |
| VA24617P6191 | 246-NETWORK CONTRACTING OFFICE 6 (36C246) · H145 · QUALITY CONTROL- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $26,600 | FY2017 |
| VA69D17C0011 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · H344 · INSPECTION- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS | $23,032 | FY2017 |
| VA24616P4402 | 246-NETWORK CONTRACTING OFFICE 6 (36C246) · H345 · INSPECTION- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $2,900 | FY2016 |
| VA24815P1929 | 248-NETWORK CONTRACT OFFICE 8 · H144 · QUALITY CONTROL- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS | $7,495 | FY2015 |
| VA69D15P0936 | 69D-NETWORK CONTRACT OFFICE 12 · J044 · MAINT/REPAIR/REBUILD OF EQUIPMENT- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTOR | $4,257 | FY2015 |
Other recipients under H345 from 540-CLARKSBURG (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA540C23027 | ACCO ENGINEERED SYSTEMS, INC. | 540-CLARKSBURG | $7,339 | FY2012 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA540P0002_3600_-NONE-_-NONE- · retrieved 2026-09-26.