Award recordCONTRACT

SAGE ENGINEERING ASSOCIATES, LLP

PIID VA528P0576· VHA· 242-NETWORK CONTRACT OFFICE 02· C211 · A/E SVCS. (INCL LANDSCAPING INTERIO· FY2009· $67,471 net obligations· UEI MXHFJK5EPFT4· NY

Description

A/E DESIGN AND SPECS, WITH CONSTRUCTION PERIOD SERVICES AS NEEDED, FOR A REPLACEMENT/UPGRADE OF THE BOILER CONTROLS COMPONENTS IN THE PLANT. OBJECTIVE IS TO ENACT ENERGY USAGE REDUCTIONS AND ASSOCIATED COST SAVINGS.

First action · last action
2009-09-25 · 2010-06-10
Transactions
3
First transaction's obligation
$67,471
Base + all options value (sum of deltas)
$67,471
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
NO SET ASIDE USED.
Offers received
2
SDVOSB flag on record
No
NAICS
541330 · ENGINEERING SERVICES

Modification chain · 3 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$67,471$0Base award · 2009-09-25 · this action $67,471 · running total $67,471Modification 2 · 2010-06-01 · this action $0 · running total $67,471Modification 1 · 2010-06-10 · this action $0 · running total $67,471
  • Base2009-09-25+$67,471= $67,471
  • Mod 22010-06-01+$0= $67,471
  • Mod 12010-06-10+$0= $67,471
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2009-09-25+$67,471$67,471A/E DESIGN AND SPECS, WITH CONSTRUCTION PERIOD SERVICES AS NEEDED, FOR A REPLACEMENT/UPGRADE OF THE BOILER CON…
Mod 2· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-06-01+$0$67,471A/E DESIGN AND SPECS, WITH CONSTRUCTION PERIOD SERVICES AS NEEDED, FOR A REPLACEMENT/UPGRADE OF THE BOILER CON…
Mod 1· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-06-10+$0$67,471A/E DESIGN AND SPECS, WITH CONSTRUCTION PERIOD SERVICES AS NEEDED, FOR A REPLACEMENT/UPGRADE OF THE BOILER CON…

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI MXHFJK5EPFT4)

AwardOffice · PSC / listingNet obligationsFY
VA52814P0158242-NETWORK CONTRACT OFFICE 02 · C215 · ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING$7,333FY2014
VA528C03294242-NETWORK CONTRACT OFFICE 02 · C211 · A/E SVCS. (INCL LANDSCAPING INTERIO$5,770FY2010
VA528P0699242-NETWORK CONTRACT OFFICE 02 · C215 · A/E PROD ENG SVCS (INCL DESIGN-CONT$23,426FY2010
VA776RA0047PCAC NATIONAL ENERGY BUSINESS CENTER · C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING$185,795FY2010
VA528C93369242-NETWORK CONTRACT OFFICE 02 · C211 · A/E SVCS. (INCL LANDSCAPING INTERIO$80,229FY2009
VA528C93370242-NETWORK CONTRACT OFFICE 02 · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$71,460FY2009

Other recipients under C211 from 242-NETWORK CONTRACT OFFICE 02 (most recent first)

AwardRecipientOfficeNet obligationsFY
VA52812C0075WATTS ARCHITECTURE & ENGINEERING, DPC242-NETWORK CONTRACT OFFICE 02$33,750FY2013
VA52812J0900HYMAN HAYES ASSOCIATES, ARCHITECTS AND ENGINEERS, LLC242-NETWORK CONTRACT OFFICE 02$91,646FY2012
VA52812C0188MILLER-REMICK, LLC242-NETWORK CONTRACT OFFICE 02$126,698FY2012
VA52812C0160EVERETT ENGINEERS, LLC242-NETWORK CONTRACT OFFICE 02$57,094FY2012
VA52812J0999SIMBARI DESIGN ARCHITECTURE, PLLC242-NETWORK CONTRACT OFFICE 02$54,641FY2012

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA528P0576_3600_-NONE-_-NONE- · retrieved 2026-09-26.