Award recordCONTRACT

ARRAY ARCHITECTS, INC.

PIID VA528P0475· VHA· 242-NETWORK CONTRACT OFFICE 02· C211 · A/E SVCS. (INCL LANDSCAPING INTERIO· FY2009· $343,872 net obligations· UEI F1Y2DNK98BA1· PA

Description

A/E SERVICES TO CONSULT ON AND DESIGN RENOVATION/EXPANSION OF EXISTING BUILDING 5 ON MAIN HOSPITAL CAMPUS, AND PROVIDE CP SERVICES.

First action · last action
2009-01-12 · 2010-11-19
Transactions
4
First transaction's obligation
$422,230
Base + all options value (sum of deltas)
$343,872
Extent competed
FOLLOW ON TO COMPETED ACTION
Other than full & open authority
FOLLOW-ON CONTRACT
Set-aside
NO SET ASIDE USED.
Offers received
3
SDVOSB flag on record
No
NAICS
541310 · ARCHITECTURAL SERVICES

Modification chain · 4 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$433,790$0Base award · 2009-01-12 · this action $422,230 · running total $422,230Modification SA2 · 2010-02-22 · this action $11,560 · running total $433,790Modification SA1 · 2010-05-09 · this action $0 · running total $433,790Modification SA3 · 2010-11-19 · this action -$89,917 · running total $343,872
  • Base2009-01-12+$422,230= $422,230
  • Mod SA22010-02-22+$11,560= $433,790
  • Mod SA12010-05-09+$0= $433,790
  • Mod SA32010-11-19-$89,917= $343,872
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2009-01-12+$422,230$422,230A/E SERVICES TO CONSULT ON AND DESIGN RENOVATION/EXPANSION OF EXISTING BUILDING 5 ON MAIN HOSPITAL CAMPUS, AND…
Mod SA2· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2010-02-22+$11,560$433,790A/E SERVICES TO CONSULT ON AND DESIGN RENOVATION/EXPANSION OF EXISTING BUILDING 5 ON MAIN HOSPITAL CAMPUS, AND…
Mod SA1· CHANGE ORDER2010-05-09+$0$433,790A/E SERVICES TO CONSULT ON AND DESIGN RENOVATION/EXPANSION OF EXISTING BUILDING 5 ON MAIN HOSPITAL CAMPUS, AND…
Mod SA3· TERMINATE FOR CONVENIENCE (COMPLETE OR PARTIAL)2010-11-19−$89,917$343,872A/E SERVICES TO CONSULT ON AND DESIGN RENOVATION/EXPANSION OF EXISTING BUILDING 5 ON MAIN HOSPITAL CAMPUS, AND…

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI F1Y2DNK98BA1)

AwardOffice · PSC / listingNet obligationsFY
VA24413J3455540-CLARKSBURG · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER$44,700FY2013
VA24413J4452245-NETWORK CONTRACT OFFICE 5 (36C245) · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER$155,234FY2013
VA24412J3147540-CLARKSBURG · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER$0FY2013
VA24412J2381245-NETWORK CONTRACT OFFICE 5 (36C245) · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER$255,300FY2012
VA540C25008540-CLARKSBURG · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER$287,420FY2012
VA540C25003540-CLARKSBURG · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER$0FY2012

Other recipients under C211 from 242-NETWORK CONTRACT OFFICE 02 (most recent first)

AwardRecipientOfficeNet obligationsFY
VA52812C0075WATTS ARCHITECTURE & ENGINEERING, DPC242-NETWORK CONTRACT OFFICE 02$33,750FY2013
VA52812J0900HYMAN HAYES ASSOCIATES, ARCHITECTS AND ENGINEERS, LLC242-NETWORK CONTRACT OFFICE 02$91,646FY2012
VA52812C0188MILLER-REMICK, LLC242-NETWORK CONTRACT OFFICE 02$126,698FY2012
VA52812C0160EVERETT ENGINEERS, LLC242-NETWORK CONTRACT OFFICE 02$57,094FY2012
VA52812J0999SIMBARI DESIGN ARCHITECTURE, PLLC242-NETWORK CONTRACT OFFICE 02$54,641FY2012

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA528P0475_3600_-NONE-_-NONE- · retrieved 2026-09-26.