Description
REDESIGN WORK FOR OR AHU- COMMISSIONING
Base award description: A/E IDIQ FOR VARIOUS SERVICES.
Modification chain · 6 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2011-06-20+$139,042= $139,042
- Mod P000022013-08-15+$18,832= $157,874
- Mod P000032013-08-16+$0= $157,874
- Mod P000042013-09-06+$16,838= $174,712
- Mod P000052014-03-25+$14,150= $188,862
- Mod P000062015-11-09-$403= $188,459
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2011-06-20 | +$139,042 | $139,042 | A/E IDIQ FOR VARIOUS SERVICES. |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-08-15 | +$18,832 | $157,874 | REDESIGN WORK FOR OR AHU |
| Mod P00003· OTHER ADMINISTRATIVE ACTION | 2013-08-16 | +$0 | $157,874 | REDESIGN WORK FOR OR AHU |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-06 | +$16,838 | $174,712 | REDESIGN WORK FOR OR AHU |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-25 | +$14,150 | $188,862 | REDESIGN WORK FOR OR AHU- COMMISSIONING |
| Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-11-09 | −$403 | $188,459 | REDESIGN WORK FOR OR AHU- COMMISSIONING |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI CKTPENKA8A63)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA52812J0900 | 242-NETWORK CONTRACT OFFICE 02 · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $91,646 | FY2012 |
| VA528C13295 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $157,681 | FY2011 |
| VA528P0799 | 242-NETWORK CONTRACT OFFICE 02 · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $502,835 | FY2010 |
| VA528Z03002 | 242-NETWORK CONTRACT OFFICE 02 · C211 · A/E SVCS. (INCL LANDSCAPING INTERIO | $69,715 | FY2010 |
| VA528C93402 | 242-NETWORK CONTRACT OFFICE 02 · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $68,195 | FY2009 |
| VA528C93390 | 242-NETWORK CONTRACT OFFICE 02 · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $162,398 | FY2009 |
Other recipients under C211 from 242-NETWORK CONTRACT OFFICE 02 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA52812C0075 | WATTS ARCHITECTURE & ENGINEERING, DPC | 242-NETWORK CONTRACT OFFICE 02 | $33,750 | FY2013 |
| VA52812C0188 | MILLER-REMICK, LLC | 242-NETWORK CONTRACT OFFICE 02 | $126,698 | FY2012 |
| VA52812C0160 | EVERETT ENGINEERS, LLC | 242-NETWORK CONTRACT OFFICE 02 | $57,094 | FY2012 |
| VA52812J0999 | SIMBARI DESIGN ARCHITECTURE, PLLC | 242-NETWORK CONTRACT OFFICE 02 | $54,641 | FY2012 |
| VA52812J0980 | GARDNER PLUS ARCHITECT, PLLC | 242-NETWORK CONTRACT OFFICE 02 | $13,254 | FY2012 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA528C13321_3600_VA528P0511A_3600 · retrieved 2026-09-26.