Description
ARCHITECT AND ENGINEERING SERVICES FOR VISN 3.
Base award description: ARCHITECT AND ENGINEERING SERVICES FOR VISN 3. PROJECT 526-10-150/SPD RENOVATION
Modification chain · 2 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2011-05-31+$225,000= $225,000
- Mod P00012013-12-13+$134,904= $359,904
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2011-05-31 | +$225,000 | $225,000 | ARCHITECT AND ENGINEERING SERVICES FOR VISN 3. PROJECT 526-10-150/SPD RENOVATION |
| Mod P0001· EXERCISE AN OPTION | 2013-12-13 | +$134,904 | $359,904 | ARCHITECT AND ENGINEERING SERVICES FOR VISN 3. |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI VF8FSTA437A1)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24225N0466 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · M1NE · OPERATION OF WATER SUPPLY FACILITIES | $260,673 | FY2025 |
| 36C24224P1186 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · M1ND · OPERATION OF SEWAGE AND WASTE FACILITIES | $1,955,520 | FY2024 |
| 36C24224P0964 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · B533 · SPECIAL STUDIES/ANALYSIS- WATER QUALITY | $4,178 | FY2024 |
| 36C24224P0969 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · M1NE · OPERATION OF WATER SUPPLY FACILITIES | $102,872 | FY2024 |
| 36C24224N0307 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · M1NE · OPERATION OF WATER SUPPLY FACILITIES | $943,339 | FY2024 |
| 36C24224F0029 | 242-NETWORK CONTRACT OFFICE 02 (36C242) · B533 · SPECIAL STUDIES/ANALYSIS- WATER QUALITY | $50,514 | FY2024 |
Other recipients under C219 from 243-NETWORK CONTRACTING OFFICE 03 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA24314C0217 | AFFILIATED ENGINEERS METRO DC, INC. | 243-NETWORK CONTRACTING OFFICE 03 | $35,500 | FY2014 |
| VA24314P1457 | CONCENTRIC GROUP, LLC | 243-NETWORK CONTRACTING OFFICE 03 | $19,650 | FY2014 |
| VA24314P0982 | FINIZIO, VINCENT A | 243-NETWORK CONTRACTING OFFICE 03 | $6,525 | FY2014 |
| VA24313F0780 | LOTHROP ASSOCIATES LLP | 243-NETWORK CONTRACTING OFFICE 03 | $0 | FY2013 |
| VA24312F2524 | ECIFM SOLUTIONS, INC. | 243-NETWORK CONTRACTING OFFICE 03 | $548,438 | FY2012 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA526C10341_3600_VA243P0219_3600 · retrieved 2026-09-26.