Description
CHANGE ORDER FOR DIFFERING SITE CONDITION
Base award description: TWO METAL BUILDINGS WITH DESIGN AND SITE PREPARATION SERVICES.
Modification chain · 6 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2010-09-22+$993,623= $993,623
- Mod CO0012011-02-03+$0= $993,623
- Mod CO0022011-04-06+$0= $993,623
- Mod SA0012011-05-03+$7,590= $1,001,213
- Mod CO0032011-06-22+$0= $1,001,213
- Mod CO0042011-06-27+$80,000= $1,081,213
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2010-09-22 | +$993,623 | $993,623 | TWO METAL BUILDINGS WITH DESIGN AND SITE PREPARATION SERVICES. |
| Mod CO001· CHANGE ORDER | 2011-02-03 | +$0 | $993,623 | TWO METAL BUILDINGS WITH DESIGN AND SITE PREPARATION SERVICES. |
| Mod CO002· CHANGE ORDER | 2011-04-06 | +$0 | $993,623 | TWO METAL BUILDINGS WITH DESIGN AND SITE PREPARATION SERVICES. |
| Mod SA001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-05-03 | +$7,590 | $1,001,213 | TWO PRE-ENGINEERED METAL BUILDINGS WITH ANCILLARY DESIGN AND ANCILLARY SITE PREPARATION SERVICES. |
| Mod CO003· CHANGE ORDER | 2011-06-22 | +$0 | $1,001,213 | STOP WORK ORDER |
| Mod CO004· CHANGE ORDER | 2011-06-27 | +$80,000 | $1,081,213 | CHANGE ORDER FOR DIFFERING SITE CONDITION |
Related awards · 6
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI P7LAGL244HK9)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA25712F1628 | 257-NETWORK CONTRACT OFFICE 17 · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $107,166 | FY2012 |
| VA25712F1616 | 257-NETWORK CONTRACT OFFICE 17 · 5410 · PREFABRICATED AND PORTABLE BUILDINGS | $110,201 | FY2012 |
| VA25812F0460 | 678-TUCSON · E1DZ · PURCHASE OF OTHER HOSPITAL BUILDINGS | $820,751 | FY2012 |
| VA25812F0458 | 258-NETWORK CONTRACT OFFICE 18 · E1DZ · PURCHASE OF OTHER HOSPITAL BUILDINGS | $839,848 | FY2012 |
| VA25112F0819 | 506-ANN ARBOR · 5410 · PREFABRICATED AND PORTABLE BUILDINGS | $70,157 | FY2012 |
| VA678C10423 | 258-NETWORK CONTRACT OFFICE 18 · Y111 · CONSTRUCTION OF OFFICE BUILDINGS | $398,328 | FY2011 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA519DO0001_3600_GS07F0216L_4730 · retrieved 2026-09-26.