Description
PROVIDES ALL LABOR ANS SPECIAL EQUIPMENT NEEDED TO CALIBRATE BURNERS FOR (3) SEMI/ANNUAL REQUIRED BURNER CALIBRATIONS BIOLER PLANT BLDG # 22 FROM 10/01/2010 TO 9/30/2011
Modification chain · 1 transaction
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2010-09-24+$16,000= $16,000
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2010-09-24 | +$16,000 | $16,000 | PROVIDES ALL LABOR ANS SPECIAL EQUIPMENT NEEDED TO CALIBRATE BURNERS FOR (3) SEMI/ANNUAL REQUIRED BURNER CALIB… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI HQLWLLA1PQN6)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24125P0807 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · H144 · QUALITY CONTROL- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS | $61,200 | FY2025 |
| 36C24124P0522 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · J044 · MAINT/REPAIR/REBUILD OF EQUIPMENT- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS | $9,675 | FY2024 |
| 36C24122P1385 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · N059 · INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $12,125 | FY2022 |
| 36C24122P0150 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · 6625 · ELECTRICAL AND ELECTRONIC PROPERTIES MEASURING AND TESTING INSTRUMENTS | $0 | FY2022 |
| 36C24121P0111 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · J045 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $11,040 | FY2021 |
| 36C24120P1221 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · H145 · QUALITY CONTROL- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $19,000 | FY2020 |
Other recipients under G099 from 518-BEDFORD (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA518C15224 | HILL-ROM, INC. | 518-BEDFORD | $347 | FY2011 |
| VA518L15080 | WAGNER, WILLIAM | 518-BEDFORD | $23,400 | FY2011 |
| VA518C15174 | MASSACHUSETTS DEPARTMENT OF ENVIRONMENTAL PROTECTION | 518-BEDFORD | $3,735 | FY2011 |
| VA518V15045 | ACCREDITATION COUNCIL FOR CONTINUING MEDICAL EDUCATION | 518-BEDFORD | $6,735 | FY2011 |
| VA518C15142 | NETWORX CORP | 518-BEDFORD | $4,020 | FY2011 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA518C15042_3600_-NONE-_-NONE- · retrieved 2026-09-26.