Award recordCONTRACT

POLT DESIGN GROUP, INC. (POLT DESIGN GROUP, INC.)

PIID VA512C00612· VHA· 512-BALTIMORE(00512)(36C512)· C214 · ARCHITECT AND ENGINEERING- GENERAL: MANAGEMENT ENGINEERING· FY2010· $99,995 net obligations· UEI YHNJHZZFL1N3· MD

Description

ARCHITECT/ENGINEER SERVICES FOR MRI SITE PREPARATION AT PP, MD

First action · last action
2010-03-22 · 2016-09-20
Transactions
7
First transaction's obligation
$99,995
Base + all options value (sum of deltas)
$99,995
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SMALL BUSINESS SET ASIDE - TOTAL
Offers received
1
SDVOSB flag on record
No
Parent IDV
VA512PP978
NAICS
541310 · ARCHITECTURAL SERVICES

Modification chain · 7 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$99,995$0Base award · 2010-03-22 · this action $99,995 · running total $99,995Modification 1 · 2010-07-01 · this action $0 · running total $99,995Modification 2 · 2010-12-02 · this action $0 · running total $99,995Modification 3 · 2011-01-31 · this action $0 · running total $99,995Modification 4 · 2011-03-31 · this action $0 · running total $99,995Modification P00001 · 2015-01-06 · this action $0 · running total $99,995Modification P00002 · 2016-09-20 · this action $0 · running total $99,995
  • Base2010-03-22+$99,995= $99,995
  • Mod 12010-07-01+$0= $99,995
  • Mod 22010-12-02+$0= $99,995
  • Mod 32011-01-31+$0= $99,995
  • Mod 42011-03-31+$0= $99,995
  • Mod P000012015-01-06+$0= $99,995
  • Mod P000022016-09-20+$0= $99,995
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2010-03-22+$99,995$99,995ARCHITECT/ENGINEER SERVICES FOR MRI SITE PREPARATION AT PP, MD
Mod 1· OTHER ADMINISTRATIVE ACTION2010-07-01+$0$99,995ARCHITECT/ENGINEER SERVICES FOR MRI SITE PREPARATION AT PP, MD
Mod 2· OTHER ADMINISTRATIVE ACTION2010-12-02+$0$99,995ARCHITECT/ENGINEER SERVICES FOR MRI SITE PREPARATION AT PP, MD
Mod 3· OTHER ADMINISTRATIVE ACTION2011-01-31+$0$99,995ARCHITECT/ENGINEER SERVICES FOR MRI SITE PREPARATION AT PP, MD
Mod 4· OTHER ADMINISTRATIVE ACTION2011-03-31+$0$99,995ARCHITECT/ENGINEER SERVICES FOR MRI SITE PREPARATION AT PP, MD
Mod P00001· OTHER ADMINISTRATIVE ACTION2015-01-06+$0$99,995ARCHITECT/ENGINEER SERVICES FOR MRI SITE PREPARATION AT PP, MD
Mod P00002· OTHER ADMINISTRATIVE ACTION2016-09-20+$0$99,995ARCHITECT/ENGINEER SERVICES FOR MRI SITE PREPARATION AT PP, MD

Related awards · 6

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI YHNJHZZFL1N3)

AwardOffice · PSC / listingNet obligationsFY
VA24413F2448460-WILMINGTON · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$81,052FY2013
VA244C30203460-WILMINGTON · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$63,988FY2013
VA24413F1449244-NETWORK CONTRACT OFFICE 4 · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$37,090FY2013
VA24413F1481244-NETWORK CONTRACT OFFICE 4 · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$26,000FY2013
VA24413F0900460-WILMINGTON · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$50,000FY2013
VA24413F0899460-WILMINGTON · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$97,215FY2013

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA512C00612_3600_VA512PP978_3600 · retrieved 2026-09-27.