Award recordCONTRACT

INDUSTRIA INC

PIID VA263C1323· VHA· 636A8-IOWA CITY HEALTH CARE SYSTEM· Y141 · CONSTRUCT/HOSPITALS & INFIRMARIES· FY2011· $2,016,784 net obligations· UEI EBX9J8B47FF8· IL

Description

INSTALLATION OF NEW LIGHTING, FLOORING, PAINTING, ASBESTOS ABATEMENT, GENERAL CONSTRUCTION OF NEW ROOMS, PER SPECIFICATIONS AND DRAWINGS.

First action · last action
2011-09-26 · 2013-06-04
Transactions
14
First transaction's obligation
$2,089,045
Base + all options value (sum of deltas)
$2,016,784
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
1
SDVOSB flag on record
Yes (self-representation)
NAICS
236220 · COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION

Modification chain · 14 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$2,093,109$0Base award · 2011-09-26 · this action $2,089,045 · running total $2,089,045Modification 1 · 2011-11-29 · this action $0 · running total $2,089,045Modification 2 · 2011-12-02 · this action $0 · running total $2,089,045Modification PO0001 · 2011-12-16 · this action $0 · running total $2,089,045Modification PO0002 · 2012-01-30 · this action $0 · running total $2,089,045Modification PO0003 · 2012-01-30 · this action $0 · running total $2,089,045Modification PO0004 · 2012-04-06 · this action -$904 · running total $2,088,141Modification P0005 · 2012-04-17 · this action $0 · running total $2,088,141Modification P00006 · 2012-05-02 · this action $4,968 · running total $2,093,109Modification P00007 · 2012-05-16 · this action $0 · running total $2,093,109Modification P00008 · 2012-09-06 · this action $0 · running total $2,093,109Modification P00009 · 2012-10-04 · this action $0 · running total $2,093,109Modification P00010 · 2013-04-10 · this action -$76,324 · running total $2,016,784Modification P00011 · 2013-06-04 · this action $0 · running total $2,016,784
  • Base2011-09-26+$2,089,045= $2,089,045
  • Mod 12011-11-29+$0= $2,089,045
  • Mod 22011-12-02+$0= $2,089,045
  • Mod PO00012011-12-16+$0= $2,089,045
  • Mod PO00022012-01-30+$0= $2,089,045
  • Mod PO00032012-01-30+$0= $2,089,045
  • Mod PO00042012-04-06-$904= $2,088,141
  • Mod P00052012-04-17+$0= $2,088,141
  • Mod P000062012-05-02+$4,968= $2,093,109
  • Mod P000072012-05-16+$0= $2,093,109
  • Mod P000082012-09-06+$0= $2,093,109
  • Mod P000092012-10-04+$0= $2,093,109
  • Mod P000102013-04-10-$76,324= $2,016,784
  • Mod P000112013-06-04+$0= $2,016,784
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2011-09-26+$2,089,045$2,089,045INSTALLATION OF NEW LIGHTING, FLOORING, PAINTING, ASBESTOS ABATEMENT, GENERAL CONSTRUCTION OF NEW ROOMS, PER S…
Mod 1· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-11-29+$0$2,089,045INSTALLATION OF NEW LIGHTING, FLOORING, PAINTING, ASBESTOS ABATEMENT, GENERAL CONSTRUCTION OF NEW ROOMS, PER S…
Mod 2· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-02+$0$2,089,045INSTALLATION OF NEW LIGHTING, FLOORING, PAINTING, ASBESTOS ABATEMENT, GENERAL CONSTRUCTION OF NEW ROOMS, PER S…
Mod PO0001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2011-12-16+$0$2,089,045INSTALLATION OF NEW LIGHTING, FLOORING, PAINTING, ASBESTOS ABATEMENT, GENERAL CONSTRUCTION OF NEW ROOMS, PER S…
Mod PO0002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-30+$0$2,089,045INSTALLATION OF NEW LIGHTING, FLOORING, PAINTING, ASBESTOS ABATEMENT, GENERAL CONSTRUCTION OF NEW ROOMS, PER S…
Mod PO0003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-01-30+$0$2,089,045INSTALLATION OF NEW LIGHTING, FLOORING, PAINTING, ASBESTOS ABATEMENT, GENERAL CONSTRUCTION OF NEW ROOMS, PER S…
Mod PO0004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-06−$904$2,088,141INSTALLATION OF NEW LIGHTING, FLOORING, PAINTING, ASBESTOS ABATEMENT, GENERAL CONSTRUCTION OF NEW ROOMS, PER S…
Mod P0005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-04-17+$0$2,088,141INSTALLATION OF NEW LIGHTING, FLOORING, PAINTING, ASBESTOS ABATEMENT, GENERAL CONSTRUCTION OF NEW ROOMS, PER S…
Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-05-02+$4,968$2,093,109INSTALLATION OF NEW LIGHTING, FLOORING, PAINTING, ASBESTOS ABATEMENT, GENERAL CONSTRUCTION OF NEW ROOMS, PER S…
Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-05-16+$0$2,093,109INSTALLATION OF NEW LIGHTING, FLOORING, PAINTING, ASBESTOS ABATEMENT, GENERAL CONSTRUCTION OF NEW ROOMS, PER S…
Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-09-06+$0$2,093,109INSTALLATION OF NEW LIGHTING, FLOORING, PAINTING, ASBESTOS ABATEMENT, GENERAL CONSTRUCTION OF NEW ROOMS, PER S…
Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2012-10-04+$0$2,093,109INSTALLATION OF NEW LIGHTING, FLOORING, PAINTING, ASBESTOS ABATEMENT, GENERAL CONSTRUCTION OF NEW ROOMS, PER S…
Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-04-10−$76,324$2,016,784INSTALLATION OF NEW LIGHTING, FLOORING, PAINTING, ASBESTOS ABATEMENT, GENERAL CONSTRUCTION OF NEW ROOMS, PER S…
Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2013-06-04+$0$2,016,784INSTALLATION OF NEW LIGHTING, FLOORING, PAINTING, ASBESTOS ABATEMENT, GENERAL CONSTRUCTION OF NEW ROOMS, PER S…

Related awards · 7

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI EBX9J8B47FF8)

AwardOffice · PSC / listingNet obligationsFY
36C25225C0040252-NETWORK CONTRACT OFFICE 12 (36C252) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES$8,220FY2025
36C25224P1108252-NETWORK CONTRACT OFFICE 12 (36C252) · J047 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PIPE, TUBING, HOSE, AND FITTINGS$12,977FY2024
36C25224P0617252-NETWORK CONTRACT OFFICE 12 (36C252) · J020 · MAINT/REPAIR/REBUILD OF EQUIPMENT- SHIP AND MARINE EQUIPMENT$39,887FY2024
36C25224P0330252-NETWORK CONTRACT OFFICE 12 (36C252) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES$10,731FY2024
36C25224P0670252-NETWORK CONTRACT OFFICE 12 (36C252) · J041 · MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT$46,581FY2024
36C25224P0206252-NETWORK CONTRACT OFFICE 12 (36C252) · J065 · MAINT/REPAIR/REBUILD OF EQUIPMENT- MEDICAL, DENTAL, AND VETERINARY EQUIPMENT AND SUPPLIES$25,599FY2024

Other recipients under Y141 from 636A8-IOWA CITY HEALTH CARE SYSTEM (most recent first)

AwardRecipientOfficeNet obligationsFY
VA263C1330RON ANDERSON CONSTRUCTION, INC636A8-IOWA CITY HEALTH CARE SYSTEM$471,830FY2011

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA263C1323_3600_-NONE-_-NONE- · retrieved 2026-09-26.