Description
IGF::OT::IGF NO-COST TIME EXTENSION
Base award description: IGF::OT::IGF FINISH 3RD FLOOR, BUILDING 6
Modification chain · 7 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2017-09-01+$319,950= $319,950
- Mod P000012017-10-16+$2,500= $322,450
- Mod P000022017-11-16-$21,091= $301,359
- Mod P000032017-12-29+$8,392= $309,751
- Mod P000042018-03-05+$20,482= $330,233
- Mod P000052018-07-18+$41,593= $371,826
- Mod P000062018-10-04+$0= $371,826
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2017-09-01 | +$319,950 | $319,950 | IGF::OT::IGF FINISH 3RD FLOOR, BUILDING 6 |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-10-16 | +$2,500 | $322,450 | IGF::OT::IGF MOVE POWER SUPPLY. |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-11-16 | −$21,091 | $301,359 | IGF::OT::IGF REMOVE CASEWORK FROM SCOPE. |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-12-29 | +$8,392 | $309,751 | IGF::OT::IGF CORE DRILLING, FLOOR BOXES AND POWER OUTLETS. |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-03-05 | +$20,482 | $330,233 | IGF::OT::IGF ONE PAINT COAT IN TWO ROOMS AND DIGITAL DIMMING CONTROL ADD. |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-07-18 | +$41,593 | $371,826 | IGF::OT::IGF LUTRON DIGITAL DIMMING SYSTEM CHANGES TO POWER AND PROVIDE AND INSTALL IT SWITCHES IN TELECOM ROO… |
| Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-10-04 | +$0 | $371,826 | IGF::OT::IGF NO-COST TIME EXTENSION |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI YL45VDKN8W98)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C26224C0286 | 262-NETWORK CONTRACT OFFICE 22 (36C262) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $3,820,024 | FY2024 |
| 36C26121P0671 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · J065 · MAINT/REPAIR/REBUILD OF EQUIPMENT- MEDICAL, DENTAL, AND VETERINARY EQUIPMENT AND SUPPLIES | $90,803 | FY2021 |
| 36C10F19C0005 | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $556,617 | FY2019 |
| 36C25818C0130 | 258-NETWORK CNTRCT OFF 22G (36C258) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES | $1,678,000 | FY2018 |
| 36C26118C0130 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES | $2,106,022 | FY2018 |
| 36C26118P2223 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · J099 · MAINT/REPAIR/REBUILD OF EQUIPMENT- MISCELLANEOUS | $179,976 | FY2018 |
Other recipients under Z1DA from 261-NETWORK CONTRACT OFFICE 21 (36C261) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C26126C0064 | AMOROSO OVERWATCH LLC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $8,897,000 | FY2026 |
| 36C26126P1121 | SACRAMENTO COMPUTER POWER, INC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $217,673 | FY2026 |
| 36C26126C0067 | V. LOPEZ JR. & SONS GENERAL ENGINEERING CONTRACTORS, INC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $2,404,795 | FY2026 |
| 36C26126C0066 | BEXAR-ADVANCED SOLUTIONS GROUP, LLC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $3,214,131 | FY2026 |
| 36C26126C0063 | MOONLITE CONSTRUCTION | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $113,041 | FY2026 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA26117C0162_3600_-NONE-_-NONE- · retrieved 2026-09-26.