Description
IGF::OT::IGF INSTALLATION OF COPPER/SILVER IONIZATION WATER TREATMENT SYTSEM FOR PBRC.
Base award description: IGF::OT::IGF INSTALLATION OF COPPER/SILVER IONIZATION WATER TREATMENT SYTSEM FOR PBRC.
Modification chain · 3 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2015-09-24+$140,247= $140,247
- Mod P000012016-08-09+$0= $140,247
- Mod P000022017-07-26-$28,127= $112,120
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2015-09-24 | +$140,247 | $140,247 | IGF::OT::IGF INSTALLATION OF COPPER/SILVER IONIZATION WATER TREATMENT SYTSEM FOR PBRC. |
| Mod P00001· CHANGE ORDER | 2016-08-09 | +$0 | $140,247 | IGF::OT::IGF INSTALLATION OF COPPER/SILVER IONIZATION WATER TREATMENT SYTSEM FOR PBRC. |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-07-26 | −$28,127 | $112,120 | IGF::OT::IGF INSTALLATION OF COPPER/SILVER IONIZATION WATER TREATMENT SYTSEM FOR PBRC. |
Related awards · 6
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI LPNXC2GXLNZ7)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24926N0653 | 249-NETWORK CONTRACT OFFICE 9 (36C249) · J046 · MAINT/REPAIR/REBUILD OF EQUIPMENT- WATER PURIFICATION AND SEWAGE TREATMENT EQUIPMENT | $155,759 | FY2026 |
| 36C26126P0734 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · J046 · MAINT/REPAIR/REBUILD OF EQUIPMENT- WATER PURIFICATION AND SEWAGE TREATMENT EQUIPMENT | $199,608 | FY2026 |
| 36C24826P0304 | 248-NETWORK CONTRACT OFFICE 8 (36C248) · F103 · ENVIRONMENTAL SYSTEMS PROTECTION- WATER QUALITY SUPPORT | $25,000 | FY2026 |
| 36C24925N0703 | 249-NETWORK CONTRACT OFFICE 9 (36C249) · J046 · MAINT/REPAIR/REBUILD OF EQUIPMENT- WATER PURIFICATION AND SEWAGE TREATMENT EQUIPMENT | $155,759 | FY2025 |
| 36C25725P0739 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · J046 · MAINT/REPAIR/REBUILD OF EQUIPMENT- WATER PURIFICATION AND SEWAGE TREATMENT EQUIPMENT | $229,941 | FY2025 |
| 36C26325P0562 | NETWORK CONTRACT OFFICE 23 (36C263) · 4610 · WATER PURIFICATION EQUIPMENT | $136,660 | FY2025 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA26115P3253_3600_-NONE-_-NONE- · retrieved 2026-09-26.