Description
IGF::OT::IGF PROVIDE AND INSTALL NEW CONDENSATE PUMP. CHANGE DOOR PANIC HARDWARE.
Base award description: IGF::OT::IGF GENERATOR SYNC&LOAD SHARING
Modification chain · 6 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2015-06-11+$4,850,992= $4,850,992
- Mod P000012015-09-02+$3,242= $4,854,234
- Mod P000022016-03-11-$16,255= $4,837,979
- Mod P000032016-06-16+$5,762= $4,843,742
- Mod P000042016-10-31+$26,408= $4,870,150
- Mod P000052017-01-30+$19,367= $4,889,516
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2015-06-11 | +$4,850,992 | $4,850,992 | IGF::OT::IGF GENERATOR SYNC&LOAD SHARING |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-02 | +$3,242 | $4,854,234 | IGF::OT::IGF 1. REMOVE THE EXISTING 30 BY 30 ACCESS PANEL BETWEEN THE BUILDING 12 2ND FLOOR ELECTRICAL ROOM AN… |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-11 | −$16,255 | $4,837,979 | IGF::OT::IGF FURNISH AND INSTALL ONE ZENITH ATS, DEDUCT ONE ASCO COMMUNICATION MODULE, RELOCATE TAP BOX PTB-1,… |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-06-16 | +$5,762 | $4,843,742 | IGF::OT::IGF PROVIDE AND INSTALL NEW CONDENSATE PUMP. CHANGE DOOR PANIC HARDWARE. |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-10-31 | +$26,408 | $4,870,150 | IGF::OT::IGF PROVIDE AND INSTALL NEW CONDENSATE PUMP. CHANGE DOOR PANIC HARDWARE. |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-01-30 | +$19,367 | $4,889,516 | IGF::OT::IGF PROVIDE AND INSTALL NEW CONDENSATE PUMP. CHANGE DOOR PANIC HARDWARE. |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI TYRXNJH9QT35)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C26119P0887 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · N059 · INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $18,889 | FY2019 |
| 36C26119C0075 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z1DZ · MAINTENANCE OF OTHER HOSPITAL BUILDINGS | $47,263 | FY2019 |
| 36C25818C0095 | 258-NETWORK CNTRCT OFF 22G (36C258) · Z2DZ · REPAIR OR ALTERATION OF OTHER HOSPITAL BUILDINGS | $670,238 | FY2018 |
| VA26117C0129 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES | $314,991 | FY2017 |
| VA26117J2461 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · N045 · INSTALLATION OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $109,870 | FY2017 |
| VA26117J2237 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Y1LZ · CONSTRUCTION OF PARKING FACILITIES | $545,200 | FY2017 |
Other recipients under Z1DA from 261-NETWORK CONTRACT OFFICE 21 (36C261) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C26126C0064 | AMOROSO OVERWATCH LLC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $8,897,000 | FY2026 |
| 36C26126P1121 | SACRAMENTO COMPUTER POWER, INC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $217,673 | FY2026 |
| 36C26126C0067 | V. LOPEZ JR. & SONS GENERAL ENGINEERING CONTRACTORS, INC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $2,404,795 | FY2026 |
| 36C26126C0066 | BEXAR-ADVANCED SOLUTIONS GROUP, LLC | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $3,214,131 | FY2026 |
| 36C26126C0063 | MOONLITE CONSTRUCTION | 261-NETWORK CONTRACT OFFICE 21 (36C261) | $113,041 | FY2026 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA26115J2149_3600_VA26112D0245_3600 · retrieved 2026-09-26.