Description
THE PURPOSE OF THIS MODIFICATION IS FOR WITHIN SCOPE WORK TO CHANGE SEGMENTED WALL FROM 90 DEGREE CORNERS TO ANGLE HEADS WHERE SEGMENTED PIECES MEET TO MAINTAIN 1" JOINT. CHANGE THE STAR PAVER TO RADIANT RED GRANITE W/ THERMAL FINISH IN LIEU OF SUNSET RED. THE PURPOSE OF THIS MODIFICATION IS ALSO TO INCLUDE WITHIN SCOPE WORK TO INCLUDE ADDITION OF ETCHED NAMES AND ELEVATION OF PLACARD MONUMENT WALL EAST ELEVATION, AND SEGMENTED SOUTH - SOUTH ELEVATION. SEE ATTACHMENTS. THE TOTAL COST OF CHANGE ORDERS AMOUNT TO $20,551.00. THE CONTRACT TOTAL INCREASES FROM $168,492.00 TO $189,043.00.
Base award description: SPECIALTY STONEWORK FOR WALK OF HONOR PROJECT
Modification chain · 2 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2015-06-22+$168,492= $168,492
- Mod P000012015-09-09+$20,551= $189,043
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2015-06-22 | +$168,492 | $168,492 | SPECIALTY STONEWORK FOR WALK OF HONOR PROJECT |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-09-09 | +$20,551 | $189,043 | THE PURPOSE OF THIS MODIFICATION IS FOR WITHIN SCOPE WORK TO CHANGE SEGMENTED WALL FROM 90 DEGREE CORNERS TO A… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI WJEUNCNNJDK4)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C78626N0176 | NATIONAL CEMETERY ADMIN (36C786) · 9930 · MEMORIALS; CEMETERIAL AND MORTUARY EQUIPMENT AND SUPPLIES | $1,194,653 | FY2026 |
| 36C78625N0378 | NATIONAL CEMETERY ADMIN (36C786) · 9930 · MEMORIALS; CEMETERIAL AND MORTUARY EQUIPMENT AND SUPPLIES | $1,247,434 | FY2025 |
| 36C78624D0010 | NATIONAL CEMETERY ADMIN (36C786) · 9930 · MEMORIALS; CEMETERIAL AND MORTUARY EQUIPMENT AND SUPPLIES | $0 | FY2024 |
| 36C78624N0454 | NATIONAL CEMETERY ADMIN (36C786) · 9930 · MEMORIALS; CEMETERIAL AND MORTUARY EQUIPMENT AND SUPPLIES | $706,890 | FY2024 |
| 36C78623P0045 | NATIONAL CEMETERY ADMIN (36C786) · 9930 · MEMORIALS; CEMETERIAL AND MORTUARY EQUIPMENT AND SUPPLIES | $331,100 | FY2023 |
| 36C78621P0287 | NATIONAL CEMETERY ADMIN (36C786) · 9930 · MEMORIALS; CEMETERIAL AND MORTUARY EQUIPMENT AND SUPPLIES | $399,156 | FY2021 |
Other recipients under 5680 from 261-NETWORK CONTRACT OFFICE 21 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA26115P3214 | NEW ENGLAND SHEET METAL WORKS, INC. | 261-NETWORK CONTRACT OFFICE 21 | $72,430 | FY2015 |
| VA26115P2959 | KEARNEY-NATIONAL INC | 261-NETWORK CONTRACT OFFICE 21 | $6,735 | FY2015 |
| VA26115F0703 | DOCUMENT IMAGING DIMENSIONS INC. | 261-NETWORK CONTRACT OFFICE 21 | $18,197 | FY2015 |
| VA26115F0746 | CONTINENTAL FLOORING CO | 261-NETWORK CONTRACT OFFICE 21 | $108,315 | FY2015 |
| VA26114P3513 | CABLE LINKS CONSTRUCTION GROUP, INC. | 261-NETWORK CONTRACT OFFICE 21 | $43,975 | FY2014 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA26115C0072_3600_-NONE-_-NONE- · retrieved 2026-09-26.