Description
IGF::OT::IGF ADDITIONAL PERIOD OF PERFORMANCE TO FACILITATE ELECTRICAL SHUTDOWNS NEEDED FOR PANEL 7DH2, 7DL, ATS-3 AND MECHANICAL ROOM AUXILIARY PANEL.
Base award description: IGF::OT::IGF ELECTRICAL ROOM RENOVATION, BUILDING 7, VA PALO ALTO.
Modification chain · 9 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2014-06-19+$116,200= $116,200
- Mod P000012014-08-05+$16,698= $132,898
- Mod P000022014-09-29+$5,396= $138,294
- Mod P000032014-10-29+$3,844= $142,138
- Mod P000042014-12-29+$0= $142,138
- Mod P000052015-02-20+$0= $142,138
- Mod P000062015-04-06+$0= $142,138
- Mod P000072015-04-17+$1,712= $143,850
- Mod P000082015-05-28+$0= $143,850
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2014-06-19 | +$116,200 | $116,200 | IGF::OT::IGF ELECTRICAL ROOM RENOVATION, BUILDING 7, VA PALO ALTO. |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-08-05 | +$16,698 | $132,898 | IGF::OT::IGF ADD LABOR AND MATERIALS FOR TO ADDITIONAL ELECTRICAL PANELS, BUILDING 7, BASEMENT ELECTRICAL PROJ… |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-09-29 | +$5,396 | $138,294 | IGF::OT::IGF INCREASE AMPS INTERRUPTING RATING TO ACCOMMODATE HIGHER RATED BREAKER PANELS. |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-10-29 | +$3,844 | $142,138 | IGF::OT::IGF INCREASE AMPS INTERRUPTING RATING FROM 10K TO 35K TO ACCOMMODATE HIGHER RATED BREAKER PANELS FOR… |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-12-29 | +$0 | $142,138 | IGF::OT::IGF TIME EXTENSION FOR EXTENSIVE ELECTRICAL MATERIAL SUBMITTALS AND COORDINATION OF ELECTRICAL SHUTDO… |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-02-20 | +$0 | $142,138 | IGF::OT::IGF TIME EXTENSION FOR EXTENSIVE ELECTRICAL MATERIAL SUBMITTALS AND COORDINATION OF ELECTRICAL SHUTDO… |
| Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-04-06 | +$0 | $142,138 | IGF::OT::IGF TIME EXTENSION FOR EXTENSIVE ELECTRICAL MATERIAL SUBMITTALS AND COORDINATION OF ELECTRICAL SHUTDO… |
| Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-04-17 | +$1,712 | $143,850 | IGF::OT::IGF ADDITIONAL WORK TO TRANSFER AUXILLIARY POWER TO PANEL DP2 BUILDING 7. |
| Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-05-28 | +$0 | $143,850 | IGF::OT::IGF ADDITIONAL PERIOD OF PERFORMANCE TO FACILITATE ELECTRICAL SHUTDOWNS NEEDED FOR PANEL 7DH2, 7DL, A… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI TYRXNJH9QT35)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C26119P0887 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · N059 · INSTALLATION OF EQUIPMENT- ELECTRICAL AND ELECTRONIC EQUIPMENT COMPONENTS | $18,889 | FY2019 |
| 36C26119C0075 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z1DZ · MAINTENANCE OF OTHER HOSPITAL BUILDINGS | $47,263 | FY2019 |
| 36C25818C0095 | 258-NETWORK CNTRCT OFF 22G (36C258) · Z2DZ · REPAIR OR ALTERATION OF OTHER HOSPITAL BUILDINGS | $670,238 | FY2018 |
| VA26117C0129 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES | $314,991 | FY2017 |
| VA26117J2461 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · N045 · INSTALLATION OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $109,870 | FY2017 |
| VA26117J2237 | 261-NETWORK CONTRACT OFFICE 21 (36C261) · Y1LZ · CONSTRUCTION OF PARKING FACILITIES | $545,200 | FY2017 |
Other recipients under J061 from 261-NETWORK CONTRACT OFFICE 21 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA26115P1889 | TECHNOLOGY, ENGINEERING & CONSTRUCTION, INC | 261-NETWORK CONTRACT OFFICE 21 | $23,208 | FY2015 |
| VA26114C0205 | RESA POWER SOLUTIONS - TRANSFORMER SERVICES, LLC | 261-NETWORK CONTRACT OFFICE 21 | $36,425 | FY2014 |
| VA26114P3222 | GRUBER TECHNICAL INC | 261-NETWORK CONTRACT OFFICE 21 | $3,041 | FY2014 |
| VA26113C0236 | CALIFORNIA GENERATOR SERVICE CORPORATION | 261-NETWORK CONTRACT OFFICE 21 | $176,502 | FY2013 |
| VA26113P2346 | MCCANN CONTRACTING INC | 261-NETWORK CONTRACT OFFICE 21 | $267,030 | FY2013 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA26114J2279_3600_VA26112D0245_3600 · retrieved 2026-09-26.