Description
IGF::OT::IGF MODIFICATION TO REMOVE DESIGN WORK FOR PHASE 2 OF THE PROJECT - CANOPY AND DISTRIBUTION SYSTEM.
Base award description: IGF::OT::IGF DESIGN CHILLER WATER / CONDENSATE CORRECTIONS THROUGHOUT CAMPUS.
Modification chain · 4 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2013-07-12+$779,058= $779,058
- Mod P000012014-05-01+$0= $779,058
- Mod P000022015-01-06+$325,000= $1,104,058
- Mod P000032015-01-08+$0= $1,104,058
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2013-07-12 | +$779,058 | $779,058 | IGF::OT::IGF DESIGN CHILLER WATER / CONDENSATE CORRECTIONS THROUGHOUT CAMPUS. |
| Mod P00001· CHANGE ORDER | 2014-05-01 | +$0 | $779,058 | IGF::OT::IGF MODIFICATION TO DEFINE PHASES AND TO DESCOPE THE CONDINSATE AND SECONDARY DISTRIBUTION. |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-01-06 | +$325,000 | $1,104,058 | IGF::OT::IGF MODIFICATION TO DEFINE PHASES AND TO DESCOPE THE CONDINSATE AND SECONDARY DISTRIBUTION. |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-01-08 | +$0 | $1,104,058 | IGF::OT::IGF MODIFICATION TO REMOVE DESIGN WORK FOR PHASE 2 OF THE PROJECT - CANOPY AND DISTRIBUTION SYSTEM. |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI E59GBKSZBKM7)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA26114J3183 | 261-NETWORK CONTRACT OFFICE 21 · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $69,097 | FY2014 |
| VA26114J1381 | 261-NETWORK CONTRACT OFFICE 21 · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $45,147 | FY2014 |
| VA26114J1280 | 261-NETWORK CONTRACT OFFICE 21 · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $111,999 | FY2014 |
| VA26114J0264 | 261-NETWORK CONTRACT OFFICE 21 · C220 · ARCHITECT AND ENGINEERING- GENERAL: STRUCTURAL ENGINEERING | $127,405 | FY2014 |
| VA26113J3142 | 261-NETWORK CONTRACT OFFICE 21 · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $49,146 | FY2013 |
| VA26112D0074 | 261-NETWORK CONTRACT OFFICE 21 · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $0 | FY2012 |
Other recipients under C219 from 261-NETWORK CONTRACT OFFICE 21 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA26115J1903 | AETYPIC, INC. | 261-NETWORK CONTRACT OFFICE 21 | $0 | FY2015 |
| VA26115J1760 | THE KPA GROUP | 261-NETWORK CONTRACT OFFICE 21 | $72,000 | FY2015 |
| VA26115J1510 | ADVANCE DESIGN CONSULTANTS, INC. | 261-NETWORK CONTRACT OFFICE 21 | $375,896 | FY2015 |
| VA26115J1380 | ADVANCE DESIGN CONSULTANTS, INC. | 261-NETWORK CONTRACT OFFICE 21 | $88,754 | FY2015 |
| VA26115J0964 | HILLIARD ARCHITECTS INC. | 261-NETWORK CONTRACT OFFICE 21 | $241,963 | FY2015 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA26113J2290_3600_VA26112D0074_3600 · retrieved 2026-09-26.