Description
IGF::OT::IGF STONE SELECTION ADJUSTMENT AND VARIANCE ADJUSTMENT.
Base award description: IGF::OT::IGF VISN 21 CONSTRUCTION MATOC IDIQ TASK ORDER TO REBUILD RETAINING WALL PARKING LOT 100 W PALO ALTO, CA
Modification chain · 12 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2013-06-18+$1,452,248= $1,452,248
- Mod P000012013-09-17+$15,069= $1,467,317
- Mod P000022013-11-15+$2,786= $1,470,103
- Mod P000032013-12-16+$4,000= $1,474,103
- Mod P000042014-03-28+$3,946= $1,478,049
- Mod P000052014-04-04+$0= $1,478,049
- Mod P000062014-04-15+$5,340= $1,483,389
- Mod P000072014-07-28+$11,976= $1,495,365
- Mod P000082014-08-26+$21,505= $1,516,870
- Mod P000092014-09-18+$0= $1,516,870
- Mod P000102015-03-19+$82,993= $1,599,863
- Mod P000112015-04-01+$37,556= $1,637,419
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2013-06-18 | +$1,452,248 | $1,452,248 | IGF::OT::IGF VISN 21 CONSTRUCTION MATOC IDIQ TASK ORDER TO REBUILD RETAINING WALL PARKING LOT 100 W PALO ALTO,… |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-09-17 | +$15,069 | $1,467,317 | IGF::OT::IGF MATERIAL TESTING ACTIVITIES AND INSPECTION SERVICES REQUIRED DURING THE PROJECT CONSTRUCTION IS T… |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-11-15 | +$2,786 | $1,470,103 | IGF::OT::IGF RELOCATE EXISTING ELECTRICAL CONDUIT AT NEW RETAINING WALL FOOTING. |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-12-16 | +$4,000 | $1,474,103 | IGF::OT::IGF RELOCATE EXISTING ELECTRICAL CONDUIT AT NEW RETAINING WALL FOOTING. |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-03-28 | +$3,946 | $1,478,049 | IGF::OT::IGF REMOVE UNFORSEEN CONCRETE |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-04 | +$0 | $1,478,049 | IGF::OT::IGF TIME EXTENSION DUE TO RAIN |
| Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-15 | +$5,340 | $1,483,389 | IGF::OT::IGF RELOCATE EXISTING SITE LIGHTING |
| Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-07-28 | +$11,976 | $1,495,365 | IGF::OT::IGF ADDITIONAL 2 YARDS OF CONCRETE FOR REVISED FOOTING DUE TO DRAIN PIPE INTERFERENCE AND INSTALL CON… |
| Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-08-26 | +$21,505 | $1,516,870 | IGF::OT::IGF FOR CAP MATERIAL THAT IS SAW CUT ON THE BOTTOME TO FIT FLUSH WITH THE TOP OF THE WALL STONE. |
| Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-09-18 | +$0 | $1,516,870 | IGF::OT::IGF WIDEN CROSSWALK AND SIDEWALK. |
| Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-03-19 | +$82,993 | $1,599,863 | IGF::OT::IGF DEMOLISH, REMOVE INSTALLED IRRIGATION CONTROLLER, MOVE AND INSTALL IRRIGATION CONTROLLER. ADD A C… |
| Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-04-01 | +$37,556 | $1,637,419 | IGF::OT::IGF STONE SELECTION ADJUSTMENT AND VARIANCE ADJUSTMENT. |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI HJJKPJHZQUB3)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA25816J0390 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $0 | FY2016 |
| VA25816J0358 | 258-NETWORK CNTRCT OFF 22G (36C258) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $0 | FY2016 |
| VA25816D0066 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $0 | FY2016 |
| VA25816D0038 | 258-NETWORK CNTRCT OFF 22G (36C258) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $0 | FY2016 |
| VA25915J3738 | 259-NETWORK CONTRACT OFFICE 19 · Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS | $0 | FY2015 |
| VA26114J3409 | 261-NETWORK CONTRACT OFFICE 21 · Z2DB · REPAIR OR ALTERATION OF LABORATORIES AND CLINICS | $38,588 | FY2014 |
Other recipients under Y1DZ from 261-NETWORK CONTRACT OFFICE 21 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA26116J1411 | TALION CONSTRUCTION, LLC | 261-NETWORK CONTRACT OFFICE 21 | $24,096 | FY2016 |
| VA26116C0004 | K.O.O. CONSTRUCTION, INC. | 261-NETWORK CONTRACT OFFICE 21 | $251,960 | FY2016 |
| VA26116J0510 | CABLE LINKS CONSTRUCTION GROUP, INC. | 261-NETWORK CONTRACT OFFICE 21 | $14,858 | FY2016 |
| VA26116J0392 | PATRIOT CONSTRUCTION INC | 261-NETWORK CONTRACT OFFICE 21 | $27,664 | FY2016 |
| VA26115J2787 | MAR-NES INCORPORATED | 261-NETWORK CONTRACT OFFICE 21 | $23,816 | FY2015 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA26113J2159_3600_VA26112D0237_3600 · retrieved 2026-09-26.