692-348 SEISMICALLY UPGRADE BLDG. 220 MODIFICATION TO SUBMIT STORM WATER RE-DESIGN.
Base award description: IGF::OT::IGF A/E AND RELATED PROFESSIONAL SERVICES
Modification chain · 5 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2016-08-30+$843,499= $843,499
- Mod P000012019-06-10+$9,080= $852,579
- Mod P000022019-06-13+$12,502= $865,081
- Mod P000032020-03-17+$11,370= $876,450
- Mod P000042021-03-03+$6,251= $882,701
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2016-08-30 | +$843,499 | $843,499 | IGF::OT::IGF A/E AND RELATED PROFESSIONAL SERVICES |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-06-10 | +$9,080 | $852,579 | IGF::OT::IGF 692-348 SEISMICALLY UGRADE BLDG. 220 AE TASK ORDER |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2019-06-13 | +$12,502 | $865,081 | IGF::OT::IGF 692-348 SEISMICALLY UPGRADE BLDG. 220 MODIFICATION TO SUBMIT STORM WATER RE-DESIGN. |
| Mod P00003· CHANGE ORDER | 2020-03-17 | +$11,370 | $876,450 | 692-348 SEISMICALLY UPGRADE BLDG. 220 MODIFICATION TO SUBMIT STORM WATER RE-DESIGN. |
| Mod P00004· CHANGE ORDER | 2021-03-03 | +$6,251 | $882,701 | 692-348 SEISMICALLY UPGRADE BLDG. 220 MODIFICATION TO SUBMIT STORM WATER RE-DESIGN. |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI LUETCMNVLFB5)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA26017J0043 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $4,188 | FY2017 |
| VA26016J1574 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $291,769 | FY2016 |
| VA26016J0777 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $62,027 | FY2016 |
| VA26016J0677 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $36,238 | FY2016 |
| VA26016D0007 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $0 | FY2016 |
| VA26015J0949 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $250,977 | FY2015 |
Other recipients under C1DA from 260-NETWORK CONTRACT OFFICE 20 (36C260) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C26026N0431 | TOLAND MIZELL MOLNAR LLC | 260-NETWORK CONTRACT OFFICE 20 (36C260) | $341,808 | FY2026 |
| 36C26026N0366 | NORTHEAST INFRASTRUCTURE LLC | 260-NETWORK CONTRACT OFFICE 20 (36C260) | $326,081 | FY2026 |
| 36C26026N0345 | AWEN SOLUTIONS GROUP, LLC | 260-NETWORK CONTRACT OFFICE 20 (36C260) | $626,346 | FY2026 |
| 36C26026N0327 | TOLAND MIZELL MOLNAR LLC | 260-NETWORK CONTRACT OFFICE 20 (36C260) | $510,150 | FY2026 |
| 36C26026N0322 | NORTHEAST INFRASTRUCTURE LLC | 260-NETWORK CONTRACT OFFICE 20 (36C260) | $1,152,629 | FY2026 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA26016J1278_3600_VA26016D0007_3600 · retrieved 2026-09-26.