Description
IGF::OT::IGF OR HVAC IMPROVEMENTS PORTLAND VAMC.
Modification chain · 2 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2015-04-20+$38,986= $38,986
- Mod P000012019-04-29+$0= $38,986
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2015-04-20 | +$38,986 | $38,986 | IGF::OT::IGF OR HVAC IMPROVEMENTS PORTLAND VAMC. |
| Mod P00001· OTHER ADMINISTRATIVE ACTION | 2019-04-29 | +$0 | $38,986 | IGF::OT::IGF OR HVAC IMPROVEMENTS PORTLAND VAMC. |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI KEJ8FQ28DHX1)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA26016J0819 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · C1DZ · ARCHITECT AND ENGINEERING- CONSTRUCTION: OTHER HOSPITAL BUILDINGS | $25,956 | FY2016 |
| VA26016J1295 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $832,247 | FY2016 |
| VA26015J0243 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $256,325 | FY2015 |
| VA26015J0182 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $56,172 | FY2015 |
| VA101F14F0247 | OFFICE OF CONSTRUCTION & FACILITIES MGMT (36C10F) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $981,707 | FY2015 |
| VA26014J0933 | 260-NETWORK CONTRACT OFFICE 20 (36C260) · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $102,269 | FY2014 |
Other recipients under C1DA from 260-NETWORK CONTRACT OFFICE 20 (36C260) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C26026N0431 | TOLAND MIZELL MOLNAR LLC | 260-NETWORK CONTRACT OFFICE 20 (36C260) | $341,808 | FY2026 |
| 36C26026N0366 | NORTHEAST INFRASTRUCTURE LLC | 260-NETWORK CONTRACT OFFICE 20 (36C260) | $326,081 | FY2026 |
| 36C26026N0345 | AWEN SOLUTIONS GROUP, LLC | 260-NETWORK CONTRACT OFFICE 20 (36C260) | $626,346 | FY2026 |
| 36C26026N0327 | TOLAND MIZELL MOLNAR LLC | 260-NETWORK CONTRACT OFFICE 20 (36C260) | $510,150 | FY2026 |
| 36C26026N0322 | NORTHEAST INFRASTRUCTURE LLC | 260-NETWORK CONTRACT OFFICE 20 (36C260) | $1,152,629 | FY2026 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA26015J0120_3600_VA26012D0010_3600 · retrieved 2026-09-26.