Award recordCONTRACT

CONTRACTORS SERVICES LLC

PIID VA259C0650· VHA· 666-SHERIDAN· Y242 · CONSTRUCT/HEATING & COOLING PLANTS· FY2010· $727,005 net obligations· UEI XXMRAUYNBEF3· ID

Description

REMOVE FENCING BLOCKING INSTALLATION OF STEAM LINES&REINSTALL FENCING AFTER INSTALLATION&BACKFILL OF NEW LINES.

Base award description: REPAIR/REPLACE STEAM MAINS PHASE 3

First action · last action
2010-06-01 · 2010-12-10
Transactions
4
First transaction's obligation
$709,098
Base + all options value (sum of deltas)
$727,005
Extent competed
NOT AVAILABLE FOR COMPETITION
Other than full & open authority
AUTHORIZED BY STATUTE
Set-aside
SDVOSB SOLE SOURCE
Offers received
1
SDVOSB flag on record
Yes (self-representation)
NAICS
237110 · WATER AND SEWER LINE AND RELATED STRUCTURES CONSTRUCTION

Modification chain · 4 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$727,005$0Base award · 2010-06-01 · this action $709,098 · running total $709,098Modification 1 · 2010-08-19 · this action $13,167 · running total $722,265Modification 2 · 2010-09-27 · this action $0 · running total $722,265Modification 3 · 2010-12-10 · this action $4,740 · running total $727,005
  • Base2010-06-01+$709,098= $709,098
  • Mod 12010-08-19+$13,167= $722,265
  • Mod 22010-09-27+$0= $722,265
  • Mod 32010-12-10+$4,740= $727,005
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2010-06-01+$709,098$709,098REPAIR/REPLACE STEAM MAINS PHASE 3
Mod 1· CHANGE ORDER2010-08-19+$13,167$722,265REPAIR/REPLACE STEAM MAINS PHASE 3 - MOD IS TO CHANGE FROM HYDROSEED TO SOD.
Mod 2· CHANGE ORDER2010-09-27+$0$722,265CHANGE STEAM PIPE REQUIREMENT UNDER BLDG 64 TO "CONNECT THE EXISTING PIPE INSIDE THE VAULT". NO COST CHANGE.
Mod 3· CHANGE ORDER2010-12-10+$4,740$727,005REMOVE FENCING BLOCKING INSTALLATION OF STEAM LINES&REINSTALL FENCING AFTER INSTALLATION&BACKFILL OF NEW LINES…

Related awards · 6

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI XXMRAUYNBEF3)

AwardOffice · PSC / listingNet obligationsFY
VA259C0838666-SHERIDAN · Y249 · CONSTRUCTION OF OTHER UTILITIES$329,500FY2011
VA259C0829666-SHERIDAN · Y249 · CONSTRUCTION OF OTHER UTILITIES$42,110FY2011
VA531C14263260-NETWORK CONTRACT OFFICE 20 · N054 · INSTALL OF PREFAB STRUCTURES$5,640FY2011
VA260C0813260-NETWORK CONTRACT OFFICE 20 · Y141 · CONSTRUCT/HOSPITALS & INFIRMARIES$325,888FY2011
VA259P0822666-SHERIDAN · Z224 · MAINT-REP-ALT/PARKING FACILITIES$5,835FY2010
VA259P0810666-SHERIDAN · Z224 · MAINT-REP-ALT/PARKING FACILITIES$60,118FY2010

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA259C0650_3600_-NONE-_-NONE- · retrieved 2026-09-26.