Description
IGF::OT::IGF 501-JIF-102 SLEEP DISORDER LAB MODIFICATION P00003 TO CHANGE COMPLETION DATE TO MATCH IFCAP/VISTA RECORD.
Base award description: "OTHER FUNCTIONS"IGF::OT::IGF 501-JIF-102 SLEEP DISORDER LAB MODIFICATION TO EXERCISE OPTION YEAR 4 OF THE SUBJECT CONTRACT.
Modification chain · 4 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2012-12-17+$206,916= $206,916
- Mod P000012014-03-26+$12,751= $219,667
- Mod P000022014-11-12+$25,793= $245,460
- Mod P000032017-02-14+$0= $245,460
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2012-12-17 | +$206,916 | $206,916 | "OTHER FUNCTIONS"IGF::OT::IGF 501-JIF-102 SLEEP DISORDER LAB MODIFICATION TO EXERCISE OPTION YEAR 4 OF THE SUB… |
| Mod P00001· CHANGE ORDER | 2014-03-26 | +$12,751 | $219,667 | IGF::OT::IGF 501-JIF-102 SLEEP DISORDER LAB MODIFICATION TO ADD DESIGN WORK WITHIN SCOPE. |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-11-12 | +$25,793 | $245,460 | IGF::OT::IGF 501-JIF-102 SLEEP DISORDER LAB MODIFICATION TO ADD DESIGN WORK WITHIN SCOPE. |
| Mod P00003· OTHER ADMINISTRATIVE ACTION | 2017-02-14 | +$0 | $245,460 | IGF::OT::IGF 501-JIF-102 SLEEP DISORDER LAB MODIFICATION P00003 TO CHANGE COMPLETION DATE TO MATCH IFCAP/VISTA… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI XJMEPMJRGJD7)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA25817C0058 | 258-NETWORK CNTRCT OFF 22G (36C258) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $11,943 | FY2017 |
| VA25813J1203 | 258-NETWORK CONTRACT OFFICE 18 · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $168,689 | FY2013 |
| VA25812J0622 | 258-NETWORK CNTRCT OFF 22G (36C258) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $937,098 | FY2012 |
| VA501C10340 | 258-NETWORK CONTRACT OFFICE 18 · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING | $84,129 | FY2011 |
| VA644X100001 | 644-PHOENIX · C215 · ARCHITECT AND ENGINEERING- GENERAL: PRODUCTION ENGINEERING | $210,374 | FY2011 |
| V678C10264 | 678-TUCSON · C219 · OTHER ARCHITECTS & ENGIN GEN | $213,868 | FY2011 |
Other recipients under C211 from 258-NETWORK CNTRCT OFF 22G (36C258) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C25821N0386 | RDC+EA, L.L.L.P. | 258-NETWORK CNTRCT OFF 22G (36C258) | $130,306 | FY2021 |
| 36C25821N0377 | SPUR SBBL COLLABORATIVE JV, INC. | 258-NETWORK CNTRCT OFF 22G (36C258) | $11,047 | FY2021 |
| 36C25821N0329 | PARADIGM ENGINEERS AND CONSTRUCTORS, PLLC | 258-NETWORK CNTRCT OFF 22G (36C258) | $846,330 | FY2021 |
| 36C25821N0249 | SPEES LLC | 258-NETWORK CNTRCT OFF 22G (36C258) | $593,071 | FY2021 |
| 36C25820N0397 | EBA-KFDE JOINT VENTURE | 258-NETWORK CNTRCT OFF 22G (36C258) | $665,502 | FY2020 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA25813J0270_3600_VA258P0174_3600 · retrieved 2026-09-26.