Description
RENOVATE GROUND LEVEL AND 2ND-7TH FLOORS ELEVATOR LOBBIES AND CONNECTING CORRIDORS AT SAN ANTONIO, PROJECT NO. 671-09-120
Modification chain · 8 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2011-09-29+$1,942,448= $1,942,448
- Mod P000022011-12-30+$6,108= $1,948,556
- Mod P000012012-01-25+$63,600= $2,012,156
- Mod P000042012-01-25+$20,565= $2,032,721
- Mod P000052012-02-02+$10,091= $2,042,812
- Mod P000032012-03-22-$89,666= $1,953,146
- Mod P000062012-09-18+$22,918= $1,976,064
- Mod P000072012-09-18+$3,498= $1,979,563
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2011-09-29 | +$1,942,448 | $1,942,448 | RENOVATE GROUND LEVEL AND 2ND-7TH FLOORS ELEVATOR LOBBIES AND CONNECTING CORRIDORS AT SAN ANTONIO, PROJECT NO.… |
| Mod P00002· CHANGE ORDER | 2011-12-30 | +$6,108 | $1,948,556 | RENOVATE GROUND LEVEL AND 2ND-7TH FLOORS ELEVATOR LOBBIES AND CONNECTING CORRIDORS AT SAN ANTONIO, PROJECT NO.… |
| Mod P00001· CHANGE ORDER | 2012-01-25 | +$63,600 | $2,012,156 | RENOVATE GROUND LEVEL AND 2ND-7TH FLOORS ELEVATOR LOBBIES AND CONNECTING CORRIDORS AT SAN ANTONIO, PROJECT NO.… |
| Mod P00004· CHANGE ORDER | 2012-01-25 | +$20,565 | $2,032,721 | RENOVATE GROUND LEVEL AND 2ND-7TH FLOORS ELEVATOR LOBBIES AND CONNECTING CORRIDORS AT SAN ANTONIO, PROJECT NO.… |
| Mod P00005· CHANGE ORDER | 2012-02-02 | +$10,091 | $2,042,812 | RENOVATE GROUND LEVEL AND 2ND-7TH FLOORS ELEVATOR LOBBIES AND CONNECTING CORRIDORS AT SAN ANTONIO, PROJECT NO.… |
| Mod P00003· CHANGE ORDER | 2012-03-22 | −$89,666 | $1,953,146 | RENOVATE GROUND LEVEL AND 2ND-7TH FLOORS ELEVATOR LOBBIES AND CONNECTING CORRIDORS AT SAN ANTONIO, PROJECT NO.… |
| Mod P00006· CHANGE ORDER | 2012-09-18 | +$22,918 | $1,976,064 | RENOVATE GROUND LEVEL AND 2ND-7TH FLOORS ELEVATOR LOBBIES AND CONNECTING CORRIDORS AT SAN ANTONIO, PROJECT NO.… |
| Mod P00007· CHANGE ORDER | 2012-09-18 | +$3,498 | $1,979,563 | RENOVATE GROUND LEVEL AND 2ND-7TH FLOORS ELEVATOR LOBBIES AND CONNECTING CORRIDORS AT SAN ANTONIO, PROJECT NO.… |
Related awards · 8
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI DK6BPGB7G9R9)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C77626C0014 | PCAC (36C776) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $48,888,178 | FY2026 |
| 36C25625C0043 | 256-NETWORK CONTRACT OFFICE 16 (36C256) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $2,907,709 | FY2025 |
| 36C10D24C0001 | VETERANS BENEFITS ADMIN (36C10D) · Z2AA · REPAIR OR ALTERATION OF OFFICE BUILDINGS | $974,000 | FY2024 |
| 36C25623C0102 | 256-NETWORK CONTRACT OFFICE 16 (36C256) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $1,393,945 | FY2023 |
| 36C25623C0106 | 256-NETWORK CONTRACT OFFICE 16 (36C256) · Y1AZ · CONSTRUCTION OF OTHER ADMINISTRATIVE FACILITIES AND SERVICE BUILDINGS | $1,189,089 | FY2023 |
| 36C25723C0086 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $2,715,040 | FY2023 |
Other recipients under Y149 from 674-TEMPLE (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA257C0765 | LEC-CMS, LP | 674-TEMPLE | $1,023,088 | FY2011 |
| VA257C0771 | LEC-CMS, LP | 674-TEMPLE | $1,301,336 | FY2011 |