ROAD AND SIDEWALK REPAIRS TO THE WACO VAMC CAMPUS. IGF::OT::IGF
Base award description: ROAD AND SIDEWALK REPAIRS TO THE WACO VAMC CAMPUS. IGF::OT::IGF
Modification chain · 4 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2014-06-17+$758,680= $758,680
- Mod P000012015-01-29+$37,454= $796,134
- Mod P000022015-04-06+$0= $796,134
- Mod P000032015-08-31+$3,364= $799,498
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2014-06-17 | +$758,680 | $758,680 | ROAD AND SIDEWALK REPAIRS TO THE WACO VAMC CAMPUS. IGF::OT::IGF |
| Mod P00001· CHANGE ORDER | 2015-01-29 | +$37,454 | $796,134 | ROAD AND SIDEWALK REPAIRS TO THE WACO VAMC CAMPUS. IGF::OT::IGF |
| Mod P00002· CHANGE ORDER | 2015-04-06 | +$0 | $796,134 | ROAD AND SIDEWALK REPAIRS TO THE WACO VAMC CAMPUS. IGF::OT::IGF |
| Mod P00003· CHANGE ORDER | 2015-08-31 | +$3,364 | $799,498 | ROAD AND SIDEWALK REPAIRS TO THE WACO VAMC CAMPUS. IGF::OT::IGF |
Related awards · 8
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI KKHJFLYKM5M5)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C25722P0874 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · J045 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $142,296 | FY2022 |
| 36C25722P0818 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · J056 · MAINT/REPAIR/REBUILD OF EQUIPMENT- CONSTRUCTION AND BUILDING MATERIALS | $12,241 | FY2022 |
| 36C25722P0715 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $0 | FY2022 |
| 36C25722P0672 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · J045 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $47,623 | FY2022 |
| 36C25722P0549 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · 5680 · MISCELLANEOUS CONSTRUCTION MATERIALS | $71,141 | FY2022 |
| 36C25722P0209 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · J049 · MAINT/REPAIR/REBUILD OF EQUIPMENT- MAINTENANCE AND REPAIR SHOP EQUIPMENT | $35,436 | FY2022 |
Other recipients under Y1LB from 257-NETWORK CONTRACT OFFICE 17 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA25714P2826 | PACE BUILDING CORPORATION | 257-NETWORK CONTRACT OFFICE 17 | $12,556 | FY2014 |
| VA25714P2779 | RM ULTIMATE CONSTRUCTION LLC | 257-NETWORK CONTRACT OFFICE 17 | $23,765 | FY2014 |