Description
REPLACE ROOF DRAINAGE SYSTEM, BLDG 7 - MODIFICATION 0006 FINAL CHANGE REQUEST.
Base award description: REPLACE ROOF DRAINAGE SYSTEM, BUILDING 7
Modification chain · 7 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2008-06-30+$612,460= $612,460
- Mod 12008-06-30+$906= $613,366
- Mod 22008-06-30+$0= $613,366
- Mod 32008-06-30+$1,014= $614,380
- Mod 42008-06-30+$0= $614,380
- Mod 52009-03-18+$50,148= $664,528
- Mod 62009-07-08-$732= $663,796
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2008-06-30 | +$612,460 | $612,460 | REPLACE ROOF DRAINAGE SYSTEM, BUILDING 7 |
| Mod 1· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2008-06-30 | +$906 | $613,366 | ROOF DRAINAGE PROJECT, BLDG 7 MODIFICATION TO REROUTE FLOOR DRAINS LOCATED IN THE PENTHOUSE. |
| Mod 2· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2008-06-30 | +$0 | $613,366 | REPLACE ROOF DRAINAGE SYSTEM, BLDG 7 - MODIFICATION 0002 ISSUED TO CORRECT MODIFICATION 0001 DESCRIPTION OF CH… |
| Mod 3· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2008-06-30 | +$1,014 | $614,380 | REPLACE ROOF DRAINAGE SYSTEM, BLDG 7 - MODIFICATION ISSUED TO REROUTE THE HORIZONTAL PIPE BETWEEN THE PENTHOUS… |
| Mod 4· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2008-06-30 | +$0 | $614,380 | REPLACE ROOF DRAINAGE SYSTEM, BLDG 7 - MODIFICATION 0004 ISSUED TO CORRECT MODIFICATION 0003 CHANGE. |
| Mod 5· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-03-18 | +$50,148 | $664,528 | REPLACE ROOF DRAINAGE SYSTEM, BLDG 7 - MODIFICATION 0005 ISSUED TO CLEAN AND RECONDITION THE EXISTING DRAINS,… |
| Mod 6· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2009-07-08 | −$732 | $663,796 | REPLACE ROOF DRAINAGE SYSTEM, BLDG 7 - MODIFICATION 0006 FINAL CHANGE REQUEST. |
Related awards · 7
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI HMNEM63VFHS1)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA256C0371 | 502-ALEXANDRIA · AD61 · CONSTRUCTION (BASIC) | $375,860 | FY2008 |
| VA256C0115 | 502-ALEXANDRIA · Z199 · MAINT-REP-ALT/MISC BLDGS | $1,657,744 | FY2008 |
Other recipients under AD61 from 502-ALEXANDRIA (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| V502C04196 | TL SERVICES, INC. | 502-ALEXANDRIA | $156,255 | FY2010 |
| V502C94326 | TL SERVICES, INC. | 502-ALEXANDRIA | $32,693 | FY2009 |
| V502C94310 | TL SERVICES, INC. | 502-ALEXANDRIA | $5,928 | FY2009 |
| V502C94287 | TL SERVICES, INC. | 502-ALEXANDRIA | $16,752 | FY2009 |
| V502C94243 | TL SERVICES, INC. | 502-ALEXANDRIA | $358,238 | FY2009 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA256C0370_3600_-NONE-_-NONE- · retrieved 2026-09-26.