PROJECT 580-16-101 UPGRADE EMERGENCY POWER SYSTEM MODIFICATION #3 TO EXTEND COMPLETION DATE
Base award description: IGF::OT::IGF PROJECT 580-16-101 UPGRADE EMERGENCY POWER SYSTEM
Modification chain · 4 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2017-09-19+$4,349,104= $4,349,104
- Mod P000012020-07-31+$0= $4,349,104
- Mod P000022020-09-30+$0= $4,349,104
- Mod P000032021-03-18+$0= $4,349,104
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2017-09-19 | +$4,349,104 | $4,349,104 | IGF::OT::IGF PROJECT 580-16-101 UPGRADE EMERGENCY POWER SYSTEM |
| Mod P00001· CHANGE ORDER | 2020-07-31 | +$0 | $4,349,104 | PROJECT 580-16-101 UPGRADE EMERGENCY POWER SYSTEM MODIFICATION #1 TO EXTEND COMPLETION DATE |
| Mod P00002· CHANGE ORDER | 2020-09-30 | +$0 | $4,349,104 | PROJECT 580-16-101 UPGRADE EMERGENCY POWER SYSTEM MODIFICATION #2 TO EXTEND COMPLETION DATE |
| Mod P00003· CHANGE ORDER | 2021-03-18 | +$0 | $4,349,104 | PROJECT 580-16-101 UPGRADE EMERGENCY POWER SYSTEM MODIFICATION #3 TO EXTEND COMPLETION DATE |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI PKY8AMMMHL38)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C10X26P0030 | SAC FREDERICK (36C10X) · 4120 · AIR CONDITIONING EQUIPMENT | $62,364 | FY2026 |
| 36C24826F0113 | 248-NETWORK CONTRACT OFFICE 8 (36C248) · 4130 · REFRIGERATION AND AIR CONDITIONING COMPONENTS | $50,705 | FY2026 |
| 36C25226P0158 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · J041 · MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT | $943,415 | FY2026 |
| 36C77625C0146 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · Z1DA · MAINTENANCE OF HOSPITALS AND INFIRMARIES | $4,498,691 | FY2025 |
| 36C25225P0793 | 252-NETWORK CONTRACT OFFICE 12 (36C252) · J047 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PIPE, TUBING, HOSE, AND FITTINGS | $9,175 | FY2025 |
| 36C77625C0067 | PCAC (36C776) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $21,130,821 | FY2025 |
Other recipients under Y1NZ from 256-NETWORK CONTRACT OFFICE 16 (36C256) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C25626C0044 | BRISTON CONSTRUCTION, LLC | 256-NETWORK CONTRACT OFFICE 16 (36C256) | $9,954,976 | FY2026 |
| 36C25626C0031 | MGI, INC. | 256-NETWORK CONTRACT OFFICE 16 (36C256) | $1,692,439 | FY2026 |
| 36C25626C0027 | UTILITY SYSTEMS SOLUTIONS, INC. | 256-NETWORK CONTRACT OFFICE 16 (36C256) | $1,154,467 | FY2026 |
| 36C25626C0005 | JUNOT GROUP, LLC | 256-NETWORK CONTRACT OFFICE 16 (36C256) | $3,102,600 | FY2026 |
| 36C25625C0019 | VENERGY GROUP LLC | 256-NETWORK CONTRACT OFFICE 16 (36C256) | $185,439 | FY2025 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA25617C0211_3600_-NONE-_-NONE- · retrieved 2026-09-26.