Description
A/E PROJECT NO. 667-16-105 IMPROVE SMOKE DAMPER ACCESS MODIFICATION P00004 NO COST CHANGE - CCD IS BEING EXTENDED DUE TO THE SP-27 CONSTRUCTION PERIOD SERVICES THAT ARE STILL BEING PERFORMED UNDER A CONSTRUCTION CONTRACT AND WILL CONTINUE UNTIL ALL OF THE CONSTRUCTION CONTRACT WORK HAS BEEN FINALIZED AND ACCEPTED BY THE GOVERNMENT FOLLOWED BY THE SP-30 RECORD DRAWINGS AND SPECIFICATIONS WORK WHEREIN THE A/E SHALL DELIVER THE AS-BUILT DRAWINGS AFTER HE RECEIVES THE MARKED-UP DOCUMENTS FROM THE RESIDENT ENGINEER. IGF::OT::IGF
Base award description: A/E PROJECT NO. 667-16-105 IMPROVE SMOKE DAMPER ACCESS IGF::OT::IGF
Modification chain · 5 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2016-06-29+$47,976= $47,976
- Mod P000012017-02-10+$0= $47,976
- Mod P000022017-06-29+$0= $47,976
- Mod P000032018-06-14+$0= $47,976
- Mod P000042018-09-17+$0= $47,976
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2016-06-29 | +$47,976 | $47,976 | A/E PROJECT NO. 667-16-105 IMPROVE SMOKE DAMPER ACCESS IGF::OT::IGF |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-02-10 | +$0 | $47,976 | A/E PROJECT NO. 667-16-105 IMPROVE SMOKE DAMPER ACCESS MODIFICATION P00001 NO COST CHANGE IGF::OT::IGF |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2017-06-29 | +$0 | $47,976 | A/E PROJECT NO. 667-16-105 IMPROVE SMOKE DAMPER ACCESS MODIFICATION P00002 NO COST CHANGE - CCD IS BEING EXTEN… |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-06-14 | +$0 | $47,976 | A/E PROJECT NO. 667-16-105 IMPROVE SMOKE DAMPER ACCESS MODIFICATION P00003 NO COST CHANGE - CCD IS BEING EXTEN… |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2018-09-17 | +$0 | $47,976 | A/E PROJECT NO. 667-16-105 IMPROVE SMOKE DAMPER ACCESS MODIFICATION P00004 NO COST CHANGE - CCD IS BEING EXTEN… |
Related awards · 7
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI N3LQGM2LZ3Q9)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24718P2736 | 247-NETWORK CONTRACT OFFICE 7 (36C247) · Z1DZ · MAINTENANCE OF OTHER HOSPITAL BUILDINGS | $1,050,187 | FY2018 |
| VA25616C0201 | 256-NETWORK CONTRACT OFFICE 16 (36C256) · C222 · ARCHITECT AND ENGINEERING- GENERAL: ELECTRICAL SYSTEMS | $9,125 | FY2016 |
Other recipients under C1DZ from 256-NETWORK CONTRACT OFFICE 16 (36C256) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C25626N0578 | DAV ENERGY SOLUTIONS, INC. | 256-NETWORK CONTRACT OFFICE 16 (36C256) | $98,432 | FY2026 |
| 36C25626N0551 | AWEN SOLUTIONS GROUP, LLC | 256-NETWORK CONTRACT OFFICE 16 (36C256) | $434,212 | FY2026 |
| 36C25626C0003 | ABOVE GROUP INC. | 256-NETWORK CONTRACT OFFICE 16 (36C256) | $136,372 | FY2026 |
| 36C25626N0206 | SPEES LLC | 256-NETWORK CONTRACT OFFICE 16 (36C256) | $102,120 | FY2026 |
| 36C25625C0024 | ENCORUS GROUP ENGINEERING, P.C. | 256-NETWORK CONTRACT OFFICE 16 (36C256) | $599,297 | FY2025 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA25616C0111_3600_-NONE-_-NONE- · retrieved 2026-09-26.