Description
ADMINISTRATIVE MODIFICATION TO EXISTING ARCHITECT-ENGINEER TASK ORDER TO CHANGE THE DESIGNATION OF CONTRACTING OFFICER'S TECHNICAL REPRESENTATIVE, FOR CONTINUED ADMINISTRATION OF THE TASK ORDER FOR A/E FOR PROJECT NUMBER 657-09-117, FCA-CORRECT SECONDARY POWER DIFICIENCIES, JB, PHASE II.
Base award description: A/E SERVICES ARE REQUIRED FOR THE PREPARATION OF SCHEMATICS, DESIGN DEVELOPMENT, CONSTRUCTION DOCUMENTS, COST ESTIMATE, AND CONSTRUCTION PERIOD SERVICES FOR PROJECT NUMBER 657-09-117, FCA-CORRECT SECONDARY POWER DIFICIENCIES, JB, PHASE II. ALL WORK SHALL BE IN ACCORDANCE WITH A/E OPEN-END CONTRACT NO. V255P(V15)-1618.
Modification chain · 3 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2009-02-19+$147,172= $147,172
- Mod 12009-04-21+$0= $147,172
- Mod 22010-10-30-$19,760= $127,412
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2009-02-19 | +$147,172 | $147,172 | A/E SERVICES ARE REQUIRED FOR THE PREPARATION OF SCHEMATICS, DESIGN DEVELOPMENT, CONSTRUCTION DOCUMENTS, COST… |
| Mod 1· OTHER ADMINISTRATIVE ACTION | 2009-04-21 | +$0 | $147,172 | ADMINISTRATIVE MODIFICATION TO EXISTING ARCHITECT-ENGINEER TASK ORDER TO CHANGE THE DESIGNATION OF CONTRACTING… |
| Mod 2· FUNDING ONLY ACTION | 2010-10-30 | −$19,760 | $127,412 | ADMINISTRATIVE MODIFICATION TO EXISTING ARCHITECT-ENGINEER TASK ORDER TO CHANGE THE DESIGNATION OF CONTRACTING… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI D7G2A5JN7P38)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA25616J1829 | 256-NETWORK CONTRACT OFFICE 16 (36C256) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $746,685 | FY2016 |
| VA25615J1008 | 256-NETWORK CONTRACT OFFICE 16 (36C256) · C219 · ARCHITECT AND ENGINEERING- GENERAL: OTHER | $637,946 | FY2015 |
| VA101F15J0143 | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $950,864 | FY2015 |
| VA25614J3975 | 256-NETWORK CONTRACT OFFICE 16 (36C256) · C1DB · ARCHITECT AND ENGINEERING- CONSTRUCTION: LABORATORIES AND CLINICS | $698,083 | FY2015 |
| VA101F14J0216 | OFFICE OF CONSTRUCTION & FACILITIES MANAGEMENT · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $518,036 | FY2014 |
| VA25713J2866 | 257-NETWORK CONTRACT OFFICE 17 (36C257) · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $767,004 | FY2013 |
Other recipients under C211 from 255-NETWORK CONTRACT OFFICE 15 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA25516J0602 | BNB DESIGN, L.L.C. | 255-NETWORK CONTRACT OFFICE 15 | $79,068 | FY2016 |
| VA25516J0503 | JUNK ARCHITECTS, P.C | 255-NETWORK CONTRACT OFFICE 15 | $25,953 | FY2016 |
| VA25515J5771 | HEALTH FACILITIES GROUP LLC | 255-NETWORK CONTRACT OFFICE 15 | $96,798 | FY2015 |
| VA25515J5633 | BHDG ARCHITECTS INC | 255-NETWORK CONTRACT OFFICE 15 | $90,237 | FY2015 |
| VA25515J4953 | MICHAEL K. SWIM, CONSULTING ENGINEER, INC. | 255-NETWORK CONTRACT OFFICE 15 | $180,449 | FY2015 |