Award recordCONTRACT

THE CHEROKEE 8A GROUP, INC.

PIID VA25014C0102· VHA· 250-NETWORK CONTRACT OFFICE 10 (36C250)· Y1DZ · CONSTRUCTION OF OTHER HOSPITAL BUILDINGS· FY2014· $8,653,052 net obligations· UEI GKUMJS8XRVP5· NJ

Description

CLINICAL ADDITION, B31 MODIFICATION P00028 - SUPPLEMENTAL AGREEMENT FOR EXISTING FLOOR PLAN THICKNESS WORK, FIREWALL CHANGES WORK, AND TO COMPLETE THE VESTIBULE SOFFIT CHANGE.

Base award description: IGF::OT::IGF CLINICAL ADDITION, B31

First action · last action
2014-09-30 · 2020-12-10
Transactions
36
First transaction's obligation
$8,274,000
Base + all options value (sum of deltas)
$8,653,052
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
6
SDVOSB flag on record
Yes (self-representation)
NAICS
236220 · COMMERCIAL AND INSTITUTIONAL BUILDING CONSTRUCTION

Modification chain · 36 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$8,653,052$0Base award · 2014-09-30 · this action $8,274,000 · running total $8,274,000Modification P00001 · 2015-08-14 · this action $73,695 · running total $8,347,695Modification PCOA · 2015-08-14 · this action $0 · running total $8,347,695Modification PCOA2 · 2015-12-03 · this action $0 · running total $8,347,695Modification P00002 · 2016-03-03 · this action $29,016 · running total $8,376,711Modification P00003 · 2016-04-13 · this action $34,894 · running total $8,411,605Modification PC0A3 · 2016-05-10 · this action $33,735 · running total $8,445,340Modification P00004 · 2016-07-08 · this action $58,580 · running total $8,503,920Modification P00005 · 2016-10-03 · this action -$52,890 · running total $8,451,030Modification P00006 · 2017-01-25 · this action $19,096 · running total $8,470,126Modification P00007 · 2017-03-30 · this action $19,242 · running total $8,489,368Modification P00008 · 2017-05-01 · this action $4,950 · running total $8,494,318Modification P00009 · 2017-05-09 · this action $0 · running total $8,494,318Modification P00010 · 2017-05-16 · this action -$8,030 · running total $8,486,288Modification P00011 · 2017-06-30 · this action $16,382 · running total $8,502,670Modification P00012 · 2017-11-21 · this action $44,209 · running total $8,546,879Modification P00013 · 2017-11-22 · this action $0 · running total $8,546,879Modification PCOA4 · 2017-12-12 · this action $0 · running total $8,546,879Modification P00014 · 2018-01-05 · this action -$9,215 · running total $8,537,664Modification PCOA5 · 2018-06-14 · this action $0 · running total $8,537,664Modification PCOA6 · 2018-08-09 · this action $0 · running total $8,537,664Modification P00015 · 2018-08-21 · this action $28,966 · running total $8,566,630Modification P00016 · 2018-08-29 · this action $0 · running total $8,566,630Modification P00017 · 2018-10-24 · this action $8,167 · running total $8,574,797Modification P00018 · 2019-01-25 · this action $9,562 · running total $8,584,359Modification PCOA7 · 2019-03-14 · this action $0 · running total $8,584,359Modification P00019 · 2019-04-26 · this action $0 · running total $8,584,359Modification P00020 · 2019-05-08 · this action $1,927 · running total $8,586,286Modification P00021 · 2019-06-10 · this action $11,333 · running total $8,597,619Modification P00022 · 2019-06-20 · this action $6,249 · running total $8,603,868Modification P00023 · 2019-07-23 · this action $75 · running total $8,603,943Modification P00024 · 2019-08-30 · this action $30,183 · running total $8,634,127Modification P00025 · 2019-09-27 · this action -$3,500 · running total $8,630,627Modification P00026 · 2019-10-30 · this action $10,931 · running total $8,641,559Modification P00027 · 2019-11-08 · this action $8,458 · running total $8,650,017Modification P00028 · 2020-12-10 · this action $3,035 · running total $8,653,052
  • Base2014-09-30+$8,274,000= $8,274,000
  • Mod P000012015-08-14+$73,695= $8,347,695
  • Mod PCOA2015-08-14+$0= $8,347,695
  • Mod PCOA22015-12-03+$0= $8,347,695
  • Mod P000022016-03-03+$29,016= $8,376,711
  • Mod P000032016-04-13+$34,894= $8,411,605
  • Mod PC0A32016-05-10+$33,735= $8,445,340
  • Mod P000042016-07-08+$58,580= $8,503,920
  • Mod P000052016-10-03-$52,890= $8,451,030
  • Mod P000062017-01-25+$19,096= $8,470,126
  • Mod P000072017-03-30+$19,242= $8,489,368
  • Mod P000082017-05-01+$4,950= $8,494,318
  • Mod P000092017-05-09+$0= $8,494,318
  • Mod P000102017-05-16-$8,030= $8,486,288
  • Mod P000112017-06-30+$16,382= $8,502,670
  • Mod P000122017-11-21+$44,209= $8,546,879
  • Mod P000132017-11-22+$0= $8,546,879
  • Mod PCOA42017-12-12+$0= $8,546,879
  • Mod P000142018-01-05-$9,215= $8,537,664
  • Mod PCOA52018-06-14+$0= $8,537,664
  • Mod PCOA62018-08-09+$0= $8,537,664
  • Mod P000152018-08-21+$28,966= $8,566,630
  • Mod P000162018-08-29+$0= $8,566,630
  • Mod P000172018-10-24+$8,167= $8,574,797
  • Mod P000182019-01-25+$9,562= $8,584,359
  • Mod PCOA72019-03-14+$0= $8,584,359
  • Mod P000192019-04-26+$0= $8,584,359
  • Mod P000202019-05-08+$1,927= $8,586,286
  • Mod P000212019-06-10+$11,333= $8,597,619
  • Mod P000222019-06-20+$6,249= $8,603,868
  • Mod P000232019-07-23+$75= $8,603,943
  • Mod P000242019-08-30+$30,183= $8,634,127
  • Mod P000252019-09-27-$3,500= $8,630,627
  • Mod P000262019-10-30+$10,931= $8,641,559
  • Mod P000272019-11-08+$8,458= $8,650,017
  • Mod P000282020-12-10+$3,035= $8,653,052
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2014-09-30+$8,274,000$8,274,000IGF::OT::IGF CLINICAL ADDITION, B31
Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2015-08-14+$73,695$8,347,695IGF::OT::IGF CLINICAL ADDITION, B31 SA #1 WATER LINE/FIRE LINE AND STORM LINE EASTSIDE
Mod PCOA· CHANGE ORDER2015-08-14+$0$8,347,695IGF::OT::IGF CLINICAL ADDITION, B31 CHANGE ORDER TO DIRECT WORK
Mod PCOA2· CHANGE ORDER2015-12-03+$0$8,347,695IGF::OT::IGF CLINICAL ADDITION, B31 CHANGE ORDER TO DIRECT WORK
Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-03-03+$29,016$8,376,711IGF::OT::IGF CLINICAL ADDITION, B31 CHANGE ORDER TO DIRECT WORK
Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-04-13+$34,894$8,411,605IGF::OT::IGF CLINICAL ADDITION, B31 CHANGE ORDER TO DIRECT WORK
Mod PC0A3· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-05-10+$33,735$8,445,340IGF::OT::IGF CLINICAL ADDITION, B31 CHANGE ORDER TO DIRECT WORK OF CHANGE ORDER PCOA 3
Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-07-08+$58,580$8,503,920IGF::OT::IGF CLINICAL ADDITION, B31 SUPPLEMENTAL AGREEMENT FOR SHEET PILING FOR SUMP-SEWAGE PITS
Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2016-10-03−$52,890$8,451,030IGF::OT::IGF CLINICAL ADDITION, B31 SUPPLEMENTAL AGREEMENT FOR CHANGES
Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-01-25+$19,096$8,470,126IGF::OT::IGF CLINICAL ADDITION, B31 SUPPLEMENTAL AGREEMENT FOR CHANGES TO MODIFY CURTAIN WALL AND SLAB ASSEMB…
Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-03-30+$19,242$8,489,368IGF::OT::IGF CLINICAL ADDITION, B31 SUPPLEMENTAL AGREEMENT FOR CHANGES UNDER BULLETIN 1R, 13 AND 30.
Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-05-01+$4,950$8,494,318IGF::OT::IGF CLINICAL ADDITION, B31 SUPPLEMENTAL AGREEMENT P00008 FOR DIFFERING SITE CONDITIONS FOUND REF. EX…
Mod P00009· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-05-09+$0$8,494,318IGF::OT::IGF CLINICAL ADDITION, B31 CONVERTS CHANGE ORDER PCOA3 TO SUPPLEMENTAL AGREEMENT
Mod P00010· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-05-16−$8,030$8,486,288IGF::OT::IGF CLINICAL ADDITION, B31 SUPPLEMENTAL AGREEMENT P0010 DEDUCT FOR STEEL CHANGES
Mod P00011· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-06-30+$16,382$8,502,670IGF::OT::IGF CLINICAL ADDITION, B31 SUPPLEMENTAL AGREEMENT P0010 DEDUCT FOR STEEL CHANGES
Mod P00012· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-11-21+$44,209$8,546,879IGF::OT::IGF CLINICAL ADDITION, B31 SUPPLEMENTAL AGREEMENT MODIFICATIONS P00012
Mod P00013· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2017-11-22+$0$8,546,879IGF::OT::IGF CLINICAL ADDITION, B31 SUPPLEMENTAL AGREEMENT NO-COST CHANGES
Mod PCOA4· CHANGE ORDER2017-12-12+$0$8,546,879IGF::OT::IGF CLINICAL ADDITION, B31 CHANGE ORDER TO DIRECT WORK OF CHANGE ORDER PCOA 4 WINDOW TINTING
Mod P00014· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-01-05−$9,215$8,537,664IGF::OT::IGF CLINICAL ADDITION, B31 MODIFICATION FOR MULTIPLE CHANGES
Mod PCOA5· CHANGE ORDER2018-06-14+$0$8,537,664IGF::OT::IGF CLINICAL ADDITION, B31 PCOA 5 - CHANGE ORDER TO DIRECT CONTRACTOR TO COMPLETE ALL WORK OUTLINE…
Mod PCOA6· CHANGE ORDER2018-08-09+$0$8,537,664IGF::OT::IGF CLINICAL ADDITION, B31 PCOA 6 - CHANGE ORDER TO DIRECT CONTRACTOR TO PROVIDE NEW STEEL SUPPORT…
Mod P00015· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-08-21+$28,966$8,566,630IGF::OT::IGF CLINICAL ADDITION, B31 MODIFICATION P00015 - SUPPLEMENTAL AGREEMENT FOR WORK OUTLINED IN BULLE…
Mod P00016· OTHER ADMINISTRATIVE ACTION2018-08-29+$0$8,566,630IGF::OT::IGF CLINICAL ADDITION, B31 MODIFICATION P00016 - ADMINISTRATIVE MODIFICATION TO REFLECT NEW PHYSIC…
Mod P00017· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2018-10-24+$8,167$8,574,797IGF::OT::IGF CLINICAL ADDITION, B31 MODIFICATION P00017 - CONTRACT VA250-14-C-0102 CLINICAL ADDITION BLDG.…
Mod P00018· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-01-25+$9,562$8,584,359IGF::OT::IGF CLINICAL ADDITION, B31 MODIFICATION P00018 - SUPPLEMENTAL AGREEMENT FOR ADDITIONAL WORK OUTL…
Mod PCOA7· CHANGE ORDER2019-03-14+$0$8,584,359IGF::OT::IGF CLINICAL ADDITION, B31 MODIFICATION PCOA 7 - CHANGE ORDER WORK IN ACCORDANCE WITH BULLETIN #…
Mod P00019· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-04-26+$0$8,584,359IGF::OT::IGF CLINICAL ADDITION, B31 MODIFICATION P00019 - CONTRACTOR TO PROVIDE ALL LABOR, MATERIALS, AND…
Mod P00020· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-05-08+$1,927$8,586,286IGF::OT::IGF CLINICAL ADDITION, B31 MODIFICATION P00020 REDUCED SOFFIT DEMO IN ACCORDANCE WITH BULLETIN #…
Mod P00021· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-06-10+$11,333$8,597,619IGF::OT::IGF CLINICAL ADDITION, B31 MODIFICATION P00021 CONTRACTOR TO PROVIDE ALL LABOR AND MATERIALS TO C…
Mod P00022· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-06-20+$6,249$8,603,868IGF::OT::IGF CLINICAL ADDITION, B31 MODIFICATION P00022 CONTRACTOR TO PROVIDE ALL LABOR AND EQUIPMENT TO…
Mod P00023· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-07-23+$75$8,603,943CLINICAL ADDITION, B31 MODIFICATION P00023 CONTRACTOR TO PROVIDE ALL MATERIALS IN ACCORDANCE WITH BULLETIN…
Mod P00024· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-08-30+$30,183$8,634,127CLINICAL ADDITION, B31 MODIFICATION P00024 SUPPLEMENTAL AGREEMENT FOR SEWER EJECTOR WORK AND OTHER WORK OUT…
Mod P00025· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-09-27−$3,500$8,630,627CLINICAL ADDITION, B31 MODIFICATION P00025 - SUPPLEMENTAL AGREEMENT FOR CREDIT FOR DELETE ASPHALT AND DELETE…
Mod P00026· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-10-30+$10,931$8,641,559CLINICAL ADDITION, B31 MODIFICATION P00026 - SUPPLEMENTAL AGREEMENT FOR WORK IN ACCORDANCE WITH BULLETIN #49…
Mod P00027· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2019-11-08+$8,458$8,650,017CLINICAL ADDITION, B31 MODIFICATION P00027 - SUPPLEMENTAL AGREEMENT FOR WORK IN ACCORDANCE WITH BULLETIN #66
Mod P00028· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE2020-12-10+$3,035$8,653,052CLINICAL ADDITION, B31 MODIFICATION P00028 - SUPPLEMENTAL AGREEMENT FOR EXISTING FLOOR PLAN THICKNESS WORK,…

Related awards · 11

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI GKUMJS8XRVP5)

AwardOffice · PSC / listingNet obligationsFY
36C24225P1478242-NETWORK CONTRACT OFFICE 02 (36C242) · J036 · MAINT/REPAIR/REBUILD OF EQUIPMENT- SPECIAL INDUSTRY MACHINERY$244,837FY2025
36C24818N4749248-NETWORK CONTRACT OFFICE 8 (36C248) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES$1,000FY2018
36C24818D0110248-NETWORK CONTRACT OFFICE 8 (36C248) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES$0FY2018
36C24818C0024248-NETWORK CONTRACT OFFICE 8 (36C248) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES$334,198FY2018
VA24817C0225248-NETWORK CONTRACT OFFICE 8 (36C248) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES$232,796FY2017
VA24817P3530248-NETWORK CONTRACT OFFICE 8 (36C248) · 4410 · INDUSTRIAL BOILERS$50,000FY2017

Other recipients under Y1DZ from 250-NETWORK CONTRACT OFFICE 10 (36C250) (most recent first)

AwardRecipientOfficeNet obligationsFY
36C25026P0850UTILITIES INSTRUMENTATION SERVICE INCORPORATED250-NETWORK CONTRACT OFFICE 10 (36C250)$52,825FY2026
36C25025P1168C. SMITH CONSTRUCTION LLC250-NETWORK CONTRACT OFFICE 10 (36C250)$23,438FY2025
36C25024P1827ED RIKE PLUMBING, INC.250-NETWORK CONTRACT OFFICE 10 (36C250)$201,096FY2024
36C25023C0095ANDERSON & SONS CONTRACTING LLC250-NETWORK CONTRACT OFFICE 10 (36C250)$37,750FY2023
36C25022P1806EAGLE CONTRACTORS, INC.250-NETWORK CONTRACT OFFICE 10 (36C250)$24,117FY2022

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA25014C0102_3600_-NONE-_-NONE- · retrieved 2026-09-26.