Description
MOD P00008 ROUTING OF EAST HYDRONIC RISERS. INSTALLING FAN COILS, ETC.
Base award description: REPLACE HVAC BLDG 1
Modification chain · 9 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2009-11-09+$3,365,000= $3,365,000
- Mod COA2009-11-09+$0= $3,365,000
- Mod 32010-06-15+$0= $3,365,000
- Mod 12010-06-16+$22,593= $3,387,593
- Mod 22010-09-29+$35,500= $3,423,093
- Mod 42010-12-15+$0= $3,423,093
- Mod 52011-02-28+$81,230= $3,504,323
- Mod P000072011-12-13+$39,720= $3,544,043
- Mod P000082012-01-19+$35,748= $3,579,791
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2009-11-09 | +$3,365,000 | $3,365,000 | REPLACE HVAC BLDG 1 |
| Mod COA· OTHER ADMINISTRATIVE ACTION | 2009-11-09 | +$0 | $3,365,000 | REPLACE HVAC BLDG 1 |
| Mod 3· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-15 | +$0 | $3,365,000 | REPLACE HVAC BLDG 1 AMENDMENT TO CONNECT TO CHILLED WATER PIPING WHICH WAS LEFT OUT OF DESIGN |
| Mod 1· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-06-16 | +$22,593 | $3,387,593 | REPLACE HVAC BLDG 1 AMENDMENT TO CONNECT TO CHILLED WATER PIPING WHICH WAS LEFT OUT OF DESIGN |
| Mod 2· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-09-29 | +$35,500 | $3,423,093 | REPLACE HVAC BLDG 1 AMENDMENT TO CONNECT TO CHILLED WATER PIPING WHICH WAS LEFT OUT OF DESIGN |
| Mod 4· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2010-12-15 | +$0 | $3,423,093 | REPLACE HVAC BLDG 1 AMENDMENT TIME EXTENSION FOR ASBESTOS ABATEMENT |
| Mod 5· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-02-28 | +$81,230 | $3,504,323 | REPLACE HVAC BLDG 1 AMENDMENT TIME EXTENSION FOR ASBESTOS ABATEMENT |
| Mod P00007· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2011-12-13 | +$39,720 | $3,544,043 | MOD P00007 FOR ASBESTOS ABATEMENT IN BUILDINGS 1 AND 17 AND CRAWLSPACE. |
| Mod P00008· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-19 | +$35,748 | $3,579,791 | MOD P00008 ROUTING OF EAST HYDRONIC RISERS. INSTALLING FAN COILS, ETC. |
Related awards · 5
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other recipients under Y141 from 596-LEXINGTON (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA249C0883 | BRISTOL GROUP, INC., THE | 596-LEXINGTON | $2,891,607 | FY2010 |
| VA249RA0813 | KDV, INC | 596-LEXINGTON | $1,079,111 | FY2009 |
| VA249C0731 | VGC | 596-LEXINGTON | $247,235 | FY2009 |
| VA249C0612 | VGC | 596-LEXINGTON | $186,127 | FY2009 |
| VA249C0424 | LEXINGTON CONTRACTING, LLC | 596-LEXINGTON | $513,849 | FY2008 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA249C0948_3600_-NONE-_-NONE- · retrieved 2026-09-26.