Description
REPLACE AHU'S 5, 6&7 MOD P00003 FOR CONTRACTOR TO ADD STEAM-TO-STEAM HUMIDIFICATION SYSTEM FOR PATIENT SAFETY, CONVERTERS, PLUMBING TIE-IN AND CONTROLS FOR AHUS 5, 6, AND 7.
Base award description: REPLACE AHU'S 5, 6&7
Modification chain · 7 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2011-06-13+$3,798,884= $3,798,884
- Mod P000012012-01-30+$0= $3,798,884
- Mod P000022012-03-06+$0= $3,798,884
- Mod P000032012-12-11+$433,619= $4,232,503
- Mod P000042013-04-30+$0= $4,232,503
- Mod P000052013-06-27+$0= $4,232,503
- Mod P000062014-05-27+$74,029= $4,306,532
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2011-06-13 | +$3,798,884 | $3,798,884 | REPLACE AHU'S 5, 6&7 |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-01-30 | +$0 | $3,798,884 | REPLACE AHU'S 5, 6&7 EXTEND COMPLETION DATE TO 3/14/2012 |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-03-06 | +$0 | $3,798,884 | REPLACE AHU'S 5, 6&7 MOD P00002 TO EXTEND CONTRACT DATE TO 5/12/2012. |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2012-12-11 | +$433,619 | $4,232,503 | REPLACE AHU'S 5, 6&7 MOD P00003 FOR CONTRACTOR TO ADD STEAM-TO-STEAM HUMIDIFICATION SYSTEM FOR PATIENT SAFETY,… |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-30 | +$0 | $4,232,503 | REPLACE AHU'S 5, 6&7 MOD P00003 FOR CONTRACTOR TO ADD STEAM-TO-STEAM HUMIDIFICATION SYSTEM FOR PATIENT SAFETY,… |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-06-27 | +$0 | $4,232,503 | REPLACE AHU'S 5, 6&7 MOD P00003 FOR CONTRACTOR TO ADD STEAM-TO-STEAM HUMIDIFICATION SYSTEM FOR PATIENT SAFETY,… |
| Mod P00006· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-05-27 | +$74,029 | $4,306,532 | REPLACE AHU'S 5, 6&7 MOD P00003 FOR CONTRACTOR TO ADD STEAM-TO-STEAM HUMIDIFICATION SYSTEM FOR PATIENT SAFETY,… |
Related awards · 7
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI KN3AMEAJFMF3)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA24913F3507 | 249-NETWORK CONTRACT OFFICE 9 (36C249) · J045 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $135,747 | FY2013 |
| VA24712F2743 | 247-NETWORK CONTRACT OFFICE 7 · N041 · INSTALLATION OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT | $209,480 | FY2012 |
Other recipients under Z141 from 596-LEXINGTON (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA249C1201 | LEAK ELIMINATORS, LLC | 596-LEXINGTON | $4,720 | FY2011 |
| VA249C1177 | LEAK ELIMINATORS, LLC | 596-LEXINGTON | $4,200 | FY2011 |
| VA596C10423 | LEAK ELIMINATORS, LLC | 596-LEXINGTON | $26,125 | FY2011 |
| VA249C0981 | ALLIED COMMUNICATIONS INC | 596-LEXINGTON | $128,557 | FY2011 |
| VA249C0901 | HAL-PE ASSOCIATES/ENGINEERING SERVICES, INC. | 596-LEXINGTON | $707,800 | FY2011 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA249C0923_3600_-NONE-_-NONE- · retrieved 2026-09-26.