Description
PM FOR BUIDING AUTOMATED SYSTEM; CONTROLS CLIMATE CHANGES THROUGH OUT THE BUILDING.
Modification chain · 7 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2008-08-14+$46,008= $46,008
- Mod 12008-10-01+$46,008= $92,016
- Mod 22009-04-10+$48,084= $140,100
- Mod 32010-03-26+$50,250= $190,350
- Mod 42010-04-01+$50,250= $240,600
- Mod 62010-10-01+$100,500= $341,100
- Mod 72011-10-01+$105,024= $446,124
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2008-08-14 | +$46,008 | $46,008 | PM FOR BUIDING AUTOMATED SYSTEM; CONTROLS CLIMATE CHANGES THROUGH OUT THE BUILDING. |
| Mod 1· EXERCISE AN OPTION | 2008-10-01 | +$46,008 | $92,016 | ANNUAL P&M ON BUILDING AUTOMATION SYSTEM |
| Mod 2· EXERCISE AN OPTION | 2009-04-10 | +$48,084 | $140,100 | PREVENTIVE MAINTENANCE |
| Mod 3· EXERCISE AN OPTION | 2010-03-26 | +$50,250 | $190,350 | PM FOR BUIDING AUTOMATED SYSTEM; CONTROLS CLIMATE CHANGES THROUGH OUT THE BUILDING. |
| Mod 4· FUNDING ONLY ACTION | 2010-04-01 | +$50,250 | $240,600 | P&M BUILDING AUTOMATION SYSTEMS |
| Mod 6· EXERCISE AN OPTION | 2010-10-01 | +$100,500 | $341,100 | PM FOR BUIDING AUTOMATED SYSTEM; CONTROLS CLIMATE CHANGES THROUGH OUT THE BUILDING. |
| Mod 7· EXERCISE AN OPTION | 2011-10-01 | +$105,024 | $446,124 | PM FOR BUIDING AUTOMATED SYSTEM; CONTROLS CLIMATE CHANGES THROUGH OUT THE BUILDING. |
Related awards · 9
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI JZXZSN3BBL98)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24926F0217 | 249-NETWORK CONTRACT OFFICE 9 (36C249) · R425 · SUPPORT- PROFESSIONAL: ENGINEERING/TECHNICAL | $101,785 | FY2026 |
| 36C25026P0958 | 250-NETWORK CONTRACT OFFICE 10 (36C250) · J042 · MAINT/REPAIR/REBUILD OF EQUIP- FIRE FIGHTING/RESCUE/SAFETY EQUIP; ENVIRON PROTECT EQUIP/MATLS | $490,686 | FY2026 |
| 36C25526P0307 | 255-NETWORK CONTRACT OFFICE 15 (36C255) · 6350 · MISCELLANEOUS ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS | $276,206 | FY2026 |
| 36C24726F0275 | 247-NETWORK CONTRACT OFFICE 7 (36C247) · J063 · MAINT/REPAIR/REBUILD OF EQUIPMENT- ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS | $391,331 | FY2026 |
| 36C24126P0548 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · J041 · MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT | $114,872 | FY2026 |
| 36C25526N0339 | 255-NETWORK CONTRACT OFFICE 15 (36C255) · H963 · OTHER QC/TEST/INSPECT- ALARM, SIGNAL, AND SECURITY DETECTION SYSTEMS | $13,083 | FY2026 |
Other recipients under J059 from 548-WEST PALM (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA24812P2295 | CREATIVE POWER SOLUTIONS INC. | 548-WEST PALM | $4,339 | FY2012 |
| V548C00390 | EATON CORPORATION | 548-WEST PALM | $10,422 | FY2010 |
| V548C00159 | PHILIPS NORTH AMERICA LLC | 548-WEST PALM | $38,007 | FY2010 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA248P0435_3600_-NONE-_-NONE- · retrieved 2026-09-26.