Description
IGF::OT::IGF - IN SCOPE CHANGES - REPLACE BOILERS, LAKE CITY VA
Base award description: IGF::OT::IGF - REPLACE WATER TUBE BOILERS WITH FIRE TUBE BOILERS UNDER NORTH MATOC IDIQ
Modification chain · 6 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2014-03-07+$2,910,029= $2,910,029
- Mod P000012015-06-10+$37,113= $2,947,142
- Mod P000022015-07-01+$30,371= $2,977,514
- Mod P000032016-01-14+$104,944= $3,082,458
- Mod P000042016-01-28+$0= $3,082,458
- Mod P000052016-03-24+$293,949= $3,376,407
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2014-03-07 | +$2,910,029 | $2,910,029 | IGF::OT::IGF - REPLACE WATER TUBE BOILERS WITH FIRE TUBE BOILERS UNDER NORTH MATOC IDIQ |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-06-10 | +$37,113 | $2,947,142 | IGF::OT::IGF - DIFFERING SITE CONDITIONS - REPLACE WATER TUBE BOILERS WITH FIRE TUBE BOILERS UNDER NORTH MATOC… |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2015-07-01 | +$30,371 | $2,977,514 | IGF::OT::IGF - DIFFERING SITE CONDITIONS - REPLACE WATER TUBE BOILERS WITH FIRE TUBE BOILERS UNDER NORTH MATOC… |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-14 | +$104,944 | $3,082,458 | IGF::OT::IGF - DIFFERING SITE CONDITIONS - ADD EXTERNAL SAFETY SWITCHES |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-01-28 | +$0 | $3,082,458 | IGF::OT::IGF - TIME EXTENSION |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2016-03-24 | +$293,949 | $3,376,407 | IGF::OT::IGF - IN SCOPE CHANGES - REPLACE BOILERS, LAKE CITY VA |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI EERXQPG9J2W7)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24626P1040 | 246-NETWORK CONTRACTING OFFICE 6 (36C246) · J045 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $54,813 | FY2026 |
| 36C24126P0345 | 241-NETWORK CONTRACT OFFICE 01 (36C241) · J035 · MAINT/REPAIR/REBUILD OF EQUIPMENT- SERVICE AND TRADE EQUIPMENT | $82,950 | FY2026 |
| 36C24626C0024 | 246-NETWORK CONTRACTING OFFICE 6 (36C246) · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $682,942 | FY2026 |
| 36C24825P1955 | 248-NETWORK CONTRACT OFFICE 8 (36C248) · J041 · MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT | $99,400 | FY2025 |
| 36C24723P0980 | 247-NETWORK CONTRACT OFFICE 7 (36C247) · J043 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PUMPS AND COMPRESSORS | $64,457 | FY2023 |
| 36C24823D0028 | 248-NETWORK CONTRACT OFFICE 8 (36C248) · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $0 | FY2023 |
Other recipients under Y1AZ from 248-NETWORK CONTRACT OFFICE 8 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA24815J2538 | UNLIMITED SERVICE ASSOCIATES INC. | 248-NETWORK CONTRACT OFFICE 8 | $24,794 | FY2015 |
| VA24815J1741 | UNLIMITED SERVICE ASSOCIATES INC. | 248-NETWORK CONTRACT OFFICE 8 | $10,847 | FY2015 |
| VA24815J0720 | UNLIMITED SERVICE ASSOCIATES INC. | 248-NETWORK CONTRACT OFFICE 8 | $24,838 | FY2015 |
| VA24814J5943 | UNLIMITED SERVICE ASSOCIATES INC. | 248-NETWORK CONTRACT OFFICE 8 | $24,000 | FY2014 |
| VA24814J5588 | UNLIMITED SERVICE ASSOCIATES INC. | 248-NETWORK CONTRACT OFFICE 8 | $15,266 | FY2014 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA24814J2704_3600_VA24812D0082_3600 · retrieved 2026-09-26.