Description
IGF::OT::IGF STEAMER INSTALLATION
First action · last action
2013-02-27 · 2013-04-29
Transactions
3
First transaction's obligation
$6,100
Base + all options value (sum of deltas)
$7,840
Extent competed
COMPETED UNDER SAP
Other than full & open authority
—
Set-aside
NO SET ASIDE USED.
Offers received
2
SDVOSB flag on record
Yes (self-representation)
NAICS
238220 · PLUMBING, HEATING, AND AIR-CONDITIONING CONTRACTORS
Modification chain · 3 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2013-02-27+$6,100= $6,100
- Mod P000012013-04-19+$1,450= $7,550
- Mod P000022013-04-29+$290= $7,840
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2013-02-27 | +$6,100 | $6,100 | IGF::OT::IGF STEAMER INSTALLATION |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-19 | +$1,450 | $7,550 | IGF::OT::IGF STEAMER INSTALLATION |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-04-29 | +$290 | $7,840 | IGF::OT::IGF STEAMER INSTALLATION |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI HFBAB2N8CM38)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA24413P4558 | 693-WILKES-BARRE · S119 · UTILITIES- OTHER | $0 | FY2013 |
| VA24413P4438 | 693-WILKES-BARRE · C213 · ARCHITECT AND ENGINEERING- GENERAL: INSPECTION (NON-CONSTRUCTION) | $44,761 | FY2013 |
| VA25713P2637 | 671-SAN ANTONIO · N041 · INSTALLATION OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT | $56,837 | FY2013 |
| VA25113P1429 | 506-ANN ARBOR · H330 · INSPECTION- MECHANICAL POWER TRANSMISSION EQUIPMENT | $14,257 | FY2013 |
| VA24513P1052 | 512-BALTIMORE · J045 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $5,241 | FY2013 |
| VA24713P0821 | 247-NETWORK CONTRACT OFFICE 7 · 5670 · BUILDING COMPONENTS, PREFABRICATED | $3,209 | FY2013 |
Other recipients under J045 from 248-NETWORK CONTRACT OFFICE 8 (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA24816P0193 | AIREKO SERVICES AND INSTALLATION LLC | 248-NETWORK CONTRACT OFFICE 8 | $8,630 | FY2016 |
| VA24816C0031 | HILTON ENGINEERING CORP | 248-NETWORK CONTRACT OFFICE 8 | $20,000 | FY2016 |
| VA24815P3096 | HOOVER PUMPING SYSTEMS CORP | 248-NETWORK CONTRACT OFFICE 8 | $9,738 | FY2015 |
| VA24815C0153 | NAVI ENGINEERING GROUP CORP | 248-NETWORK CONTRACT OFFICE 8 | $10,220 | FY2015 |
| VA24815P2639 | CGN ENGINEERING CORP | 248-NETWORK CONTRACT OFFICE 8 | $7,919 | FY2015 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA24813P2643_3600_-NONE-_-NONE- · retrieved 2026-09-26.