PROVIDE AND INSTALL A NEW FULLY INTEGRATED BOILER PLANT CONTROL SYSTEM.
Modification chain · 2 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2008-06-17+$384,704= $384,704
- Mod 12008-09-02+$0= $384,704
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2008-06-17 | +$384,704 | $384,704 | PROVIDE AND INSTALL A NEW FULLY INTEGRATED BOILER PLANT CONTROL SYSTEM. |
| Mod 1· OTHER ADMINISTRATIVE ACTION | 2008-09-02 | +$0 | $384,704 | PROVIDE AND INSTALL A NEW FULLY INTEGRATED BOILER PLANT CONTROL SYSTEM. |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI RE5SAD4KAJM5)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24818C0011 | 248-NETWORK CONTRACT OFFICE 8 (36C248) · H344 · INSPECTION- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS | $53,750 | FY2018 |
| VA24817P0234 | 248-NETWORK CONTRACT OFFICE 8 (36C248) · 6515 · MEDICAL AND SURGICAL INSTRUMENTS, EQUIPMENT, AND SUPPLIES | $8,897 | FY2017 |
| VA24815P3190 | 248-NETWORK CONTRACT OFFICE 8 (36C248) · J049 · MAINT/REPAIR/REBUILD OF EQUIPMENT- MAINTENANCE AND REPAIR SHOP EQUIPMENT | $89,868 | FY2015 |
| VA24814P4809 | 248-NETWORK CONTRACT OFFICE 8 · J049 · MAINT/REPAIR/REBUILD OF EQUIPMENT- MAINTENANCE AND REPAIR SHOP EQUIPMENT | $19,840 | FY2015 |
| VA24814P0358 | 248-NETWORK CONTRACT OFFICE 8 · 4410 · INDUSTRIAL BOILERS | $4,223 | FY2014 |
| VA24814P0078 | 248-NETWORK CONTRACT OFFICE 8 · J044 · MAINT/REPAIR/REBUILD OF EQUIPMENT- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTOR | $20,000 | FY2014 |
Other recipients under Z149 from 516-BAY PINES (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA248C1957 | JPL & ASSOCIATES, LLC | 516-BAY PINES | $290,606 | FY2011 |
| VA248C1959 | BIOSPHERE INTERNATIONAL INC | 516-BAY PINES | $99,992 | FY2011 |
| VA248C1504 | COTUGNO CONTRACTING CORP | 516-BAY PINES | $302,851 | FY2010 |
| VA516C00885 | HOMELAND SECURITY CONSTRUCTION CORP | 516-BAY PINES | $5,436 | FY2010 |
| VA248C1373 | ARC DEVELOPMENT INC | 516-BAY PINES | $6,364 | FY2010 |