Description
INSPECTION AND TESTING OF BOILER PLANT BASE PLUS 4
Base award description: IGF::CL::IGF INSPECTION AND TESTING OF BOILER PLANT BASE PLUS 4
Modification chain · 7 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2017-08-04+$14,742= $14,742
- Mod P000012018-07-03+$0= $14,742
- Mod P000022018-07-28+$15,437= $30,179
- Mod P000032019-07-25+$16,164= $46,343
- Mod P000042020-07-08+$16,926= $63,269
- Mod P000052021-02-10-$8,082= $55,187
- Mod P000062021-06-01+$17,723= $72,910
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2017-08-04 | +$14,742 | $14,742 | IGF::CL::IGF INSPECTION AND TESTING OF BOILER PLANT BASE PLUS 4 |
| Mod P00001· CHANGE ORDER | 2018-07-03 | +$0 | $14,742 | IGF::CL::IGF INSPECTION AND TESTING OF BOILER PLANT BASE PLUS 4 |
| Mod P00002· OTHER ADMINISTRATIVE ACTION | 2018-07-28 | +$15,437 | $30,179 | IGF::CL::IGF INSPECTION AND TESTING OF BOILER PLANT BASE PLUS 4 |
| Mod P00003· EXERCISE AN OPTION | 2019-07-25 | +$16,164 | $46,343 | INSPECTION AND TESTING OF BOILER PLANT BASE PLUS 4 |
| Mod P00004· EXERCISE AN OPTION | 2020-07-08 | +$16,926 | $63,269 | INSPECTION AND TESTING OF BOILER PLANT BASE PLUS 4 |
| Mod P00005· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2021-02-10 | −$8,082 | $55,187 | INSPECTION AND TESTING OF BOILER PLANT BASE PLUS 4 |
| Mod P00006· EXERCISE AN OPTION | 2021-06-01 | +$17,723 | $72,910 | INSPECTION AND TESTING OF BOILER PLANT BASE PLUS 4 |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI L114LNJ4UQP7)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24726P0319 | 247-NETWORK CONTRACT OFFICE 7 (36C247) · J044 · MAINT/REPAIR/REBUILD OF EQUIPMENT- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS | $21,726 | FY2026 |
| 36C24724P1044 | 247-NETWORK CONTRACT OFFICE 7 (36C247) · J044 · MAINT/REPAIR/REBUILD OF EQUIPMENT- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS | $0 | FY2024 |
| 36C24724P0044 | 247-NETWORK CONTRACT OFFICE 7 (36C247) · J045 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $416,528 | FY2024 |
| 36C24724P0055 | 247-NETWORK CONTRACT OFFICE 7 (36C247) · J044 · MAINT/REPAIR/REBUILD OF EQUIPMENT- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS | $544,144 | FY2024 |
| 36C25623P0896 | 256-NETWORK CONTRACT OFFICE 16 (36C256) · J049 · MAINT/REPAIR/REBUILD OF EQUIPMENT- MAINTENANCE AND REPAIR SHOP EQUIPMENT | $0 | FY2023 |
| 36C24723P0697 | 247-NETWORK CONTRACT OFFICE 7 (36C247) · J045 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $36,187 | FY2023 |
Other recipients under H345 from 247-NETWORK CONTRACT OFFICE 7 (36C247) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C24723F0011 | VENERGY GROUP LLC | 247-NETWORK CONTRACT OFFICE 7 (36C247) | $116,120 | FY2023 |
| 36C24721P0168 | CALDAIA CONTROLS LLC | 247-NETWORK CONTRACT OFFICE 7 (36C247) | $39,540 | FY2021 |
| 36C24719P0834 | TEKTON CC, LLC | 247-NETWORK CONTRACT OFFICE 7 (36C247) | $52,869 | FY2019 |
| 36C24718P2656 | JOHNSON CONTROLS INC | 247-NETWORK CONTRACT OFFICE 7 (36C247) | $10,780 | FY2018 |
| VA24717C0199 | DAMARC QUALITY INSPECTION SERVICES LLC | 247-NETWORK CONTRACT OFFICE 7 (36C247) | $36,228 | FY2018 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA24717C0172_3600_-NONE-_-NONE- · retrieved 2026-09-26.