Description
IGF::OT::IGF BILATERAL MODIFICATION FOR REMOVAL OF ASBESTOS ON HVAC UNIT WITHIN THE SCOPE OF ORIGINAL CONTRACT- UPGRADE HVAC PHASE 3 BLDG 47, VAMC ASHEVILLE, NC.
Base award description: IGF::OT::IGF UPGRADE HVAC PHASE BLDG 47, VAMC ASHEVILLE, NC
Modification chain · 6 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2013-03-08+$1,280,070= $1,280,070
- Mod P000012013-12-05+$0= $1,280,070
- Mod P000022014-01-30+$41,390= $1,321,460
- Mod P000032014-04-17+$63,285= $1,384,745
- Mod P000042014-08-27+$69,077= $1,453,822
- Mod P000052016-06-17-$38,295= $1,415,528
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2013-03-08 | +$1,280,070 | $1,280,070 | IGF::OT::IGF UPGRADE HVAC PHASE BLDG 47, VAMC ASHEVILLE, NC |
| Mod P00001· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2013-12-05 | +$0 | $1,280,070 | IGF::OT::IGF BILATERAL MODIFICATION IAW VAAR 582.236-82 FOR PMT OF STORED MATERIAL - UPGRADE HVAC PHASE BLDG 4… |
| Mod P00002· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-01-30 | +$41,390 | $1,321,460 | IGF::OT::IGF BILATERAL MODIFICATION FOR ASBESTOS ABATEMENT WITHIN THE SCOPE OF ORIGINAL CONTRACT- UPGRADE HVAC… |
| Mod P00003· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-04-17 | +$63,285 | $1,384,745 | IGF::OT::IGF BILATERAL MODIFICATION FOR ADDITIONAL RENOVATIONS WITHIN THE SCOPE OF ORIGINAL CONTRACT- UPGRADE… |
| Mod P00004· SUPPLEMENTAL AGREEMENT FOR WORK WITHIN SCOPE | 2014-08-27 | +$69,077 | $1,453,822 | IGF::OT::IGF BILATERAL MODIFICATION FOR REMOVAL OF ASBESTOS ON HVAC UNIT WITHIN THE SCOPE OF ORIGINAL CONTRACT… |
| Mod P00005· CHANGE ORDER | 2016-06-17 | −$38,295 | $1,415,528 | IGF::OT::IGF BILATERAL MODIFICATION FOR REMOVAL OF ASBESTOS ON HVAC UNIT WITHIN THE SCOPE OF ORIGINAL CONTRACT… |
Related awards · 11
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI JNS6XTGNC844)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| VA25913C0163 | NETWORK CONTRACT OFFICE 19 (36C259) · C223 · ARCHITECT AND ENGINEERING- GENERAL: MECHANICAL SYSTEMS | $154,457 | FY2013 |
| VA25913C0166 | 259-NETWORK CONTRACT OFFICE 19 · C223 · ARCHITECT AND ENGINEERING- GENERAL: MECHANICAL SYSTEMS | $95,034 | FY2013 |
| VA24913C0127 | 621-MOUNTAIN HOME · C1DA · ARCHITECT AND ENGINEERING- CONSTRUCTION: HOSPITALS AND INFIRMARIES | $65,983 | FY2013 |
| VA24412C0514 | 503-ALTOONA · Z1DZ · MAINTENANCE OF OTHER HOSPITAL BUILDINGS | $192,439 | FY2012 |
| VA24412C0503 | 503-ALTOONA · Z2DA · REPAIR OR ALTERATION OF HOSPITALS AND INFIRMARIES | $22,844 | FY2012 |
| VA24612C0073 | 246-NETWORK CONTRACTING OFFICE 6 · Y1DA · CONSTRUCTION OF HOSPITALS AND INFIRMARIES | $179,734 | FY2012 |
Other recipients under Z1DA from 246-NETWORK CONTRACTING OFFICE 6 (36C246) (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| 36C24626P1055 | MC3 SOLUTIONS LLC | 246-NETWORK CONTRACTING OFFICE 6 (36C246) | $36,605 | FY2026 |
| 36C24626P0863 | PHILLIPS C&C LLC | 246-NETWORK CONTRACTING OFFICE 6 (36C246) | $84,216 | FY2026 |
| 36C24626C0044 | PHILLIPS C&C LLC | 246-NETWORK CONTRACTING OFFICE 6 (36C246) | $7,210,000 | FY2026 |
| 36C24626C0039 | MGI, INC. | 246-NETWORK CONTRACTING OFFICE 6 (36C246) | $499,406 | FY2026 |
| 36C24626C0040 | PHILLIPS C&C LLC | 246-NETWORK CONTRACTING OFFICE 6 (36C246) | $3,810,880 | FY2026 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA24613C0032_3600_-NONE-_-NONE- · retrieved 2026-09-26.