Award recordCONTRACT

TNF-PENZA JOINT VENTURE

PIID VA245P0602· VHA· 245-NETWORK CONTRACT OFFICE 5 (36C245)· C114 · HOSPITAL BUILDINGS· FY2011· $771,917 net obligations· UEI L7B4Y61NFYJ8· IL

Description

A&E DESIGN SERVICES FOR BUILDING 80 AT PERRY POINT MOD 4 TIME EXTENSION.

Base award description: A&E DESIGN SERVICES FOR BUILDING 80 AT PERRY POINT.

First action · last action
2011-05-10 · 2018-11-30
Transactions
5
First transaction's obligation
$700,000
Base + all options value (sum of deltas)
$771,917
Extent competed
FULL AND OPEN COMPETITION AFTER EXCLUSION OF SOURCES
Other than full & open authority
—
Set-aside
SERVICE DISABLED VETERAN OWNED SMALL BUSINESS SET-ASIDE
Offers received
15
SDVOSB flag on record
Yes (self-representation)
NAICS
541330 · ENGINEERING SERVICES

Modification chain · 5 transactions

Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.

$771,917$0Base award · 2011-05-10 · this action $700,000 · running total $700,000Modification P00001 · 2013-08-16 · this action $16,640 · running total $716,640Modification P00002 · 2017-02-07 · this action $55,277 · running total $771,917Modification P00003 · 2018-04-11 · this action $0 · running total $771,917Modification P00004 · 2018-11-30 · this action $0 · running total $771,917
  • Base2011-05-10+$700,000= $700,000
  • Mod P000012013-08-16+$16,640= $716,640
  • Mod P000022017-02-07+$55,277= $771,917
  • Mod P000032018-04-11+$0= $771,917
  • Mod P000042018-11-30+$0= $771,917
TransactionAction dateThis action (delta)Running totalDescription on this transaction
Base2011-05-10+$700,000$700,000A&E DESIGN SERVICES FOR BUILDING 80 AT PERRY POINT.
Mod P00001· ADDITIONAL WORK (NEW AGREEMENT,FAR PART 6 APPLI2013-08-16+$16,640$716,640A&E DESIGN SERVICES FOR BUILDING 80 AT PERRY POINT.
Mod P00002· CHANGE ORDER2017-02-07+$55,277$771,917A&E DESIGN SERVICES FOR BUILDING 80 AT PERRY POINT.
Mod P00003· OTHER ADMINISTRATIVE ACTION2018-04-11+$0$771,917A&E DESIGN SERVICES FOR BUILDING 80 AT PERRY POINT.
Mod P00004· OTHER ADMINISTRATIVE ACTION2018-11-30+$0$771,917A&E DESIGN SERVICES FOR BUILDING 80 AT PERRY POINT MOD 4 TIME EXTENSION.

Related awards · 1

Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.

Other VA awards to the same recipient (UEI L7B4Y61NFYJ8)

AwardOffice · PSC / listingNet obligationsFY
VA245C0527512-BALTIMORE(00512)(36C512) · C211 · ARCHITECT AND ENGINEERING- GENERAL: LANDSCAPING, INTERIOR LAYOUT, AND DESIGNING$710,455FY2010

Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA245P0602_3600_-NONE-_-NONE- · retrieved 2026-09-26.