Description
V540C03174 TEMPORARY BOILER
First action · last action
2010-02-16 · 2010-09-21
Transactions
5
First transaction's obligation
$65,377
Base + all options value (sum of deltas)
$96,902
Extent competed
NOT COMPETED
Other than full & open authority
URGENCY
Set-aside
NO SET ASIDE USED.
Offers received
1
SDVOSB flag on record
No
NAICS
238220 · PLUMBING, HEATING, AND AIR-CONDITIONING CONTRACTORS
Modification chain · 5 transactions
Each row is one published transaction. This action is the obligation recorded on that transaction — a change amount, as USAspending publishes it. Running total is computed by Glassbox VA as the cumulative sum of those amounts up to and including the row, so the last running total equals the award's net obligations shown above. The cumulative-total columns in the source files are not used: they are not frozen per modification.
- Base2010-02-16+$65,377= $65,377
- Mod 12010-06-22+$9,700= $75,077
- Mod 22010-07-19+$9,700= $84,777
- Mod 32010-08-20+$9,700= $94,477
- Mod 42010-09-21+$2,425= $96,902
| Transaction | Action date | This action (delta) | Running total | Description on this transaction |
|---|---|---|---|---|
| Base | 2010-02-16 | +$65,377 | $65,377 | V540C03174 TEMPORARY BOILER |
| Mod 1· CHANGE ORDER | 2010-06-22 | +$9,700 | $75,077 | V540C03174 TEMPORARY BOILER |
| Mod 2· CHANGE ORDER | 2010-07-19 | +$9,700 | $84,777 | V540C03174 TEMPORARY BOILER |
| Mod 3· CHANGE ORDER | 2010-08-20 | +$9,700 | $94,477 | V540C03174 TEMPORARY BOILER |
| Mod 4· CHANGE ORDER | 2010-09-21 | +$2,425 | $96,902 | V540C03174 TEMPORARY BOILER |
Related awards · 7
Awards are related by an explicit link in the data, stated for each group below — never by text similarity. Values are net obligations.
Other VA awards to the same recipient (UEI VKBEQJ87JY66)
| Award | Office · PSC / listing | Net obligations | FY |
|---|---|---|---|
| 36C24426P0072 | 244-NETWORK CONTRACT OFFICE 4 (36C244) · J044 · MAINT/REPAIR/REBUILD OF EQUIPMENT- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS | $29,030 | FY2026 |
| 36C24425P0189 | 244-NETWORK CONTRACT OFFICE 4 (36C244) · J044 · MAINT/REPAIR/REBUILD OF EQUIPMENT- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS | $8,078 | FY2025 |
| 36C24424P0559 | 244-NETWORK CONTRACT OFFICE 4 (36C244) · J041 · MAINT/REPAIR/REBUILD OF EQUIPMENT- REFRIGERATION, AIR CONDITIONING, AND AIR CIRCULATING EQUIPMENT | $99,624 | FY2024 |
| 36C24424P0604 | 244-NETWORK CONTRACT OFFICE 4 (36C244) · J044 · MAINT/REPAIR/REBUILD OF EQUIPMENT- FURNACE, STEAM PLANT, AND DRYING EQUIPMENT; NUCLEAR REACTORS | $59,188 | FY2024 |
| 36C24421P0704 | 244-NETWORK CONTRACT OFFICE 4 (36C244) · J045 · MAINT/REPAIR/REBUILD OF EQUIPMENT- PLUMBING, HEATING, AND WASTE DISPOSAL EQUIPMENT | $8,086 | FY2021 |
| 36C24421P0489 | 244-NETWORK CONTRACT OFFICE 4 (36C244) · J034 · MAINT/REPAIR/REBUILD OF EQUIPMENT- METALWORKING MACHINERY | $15,030 | FY2021 |
Other recipients under W030 from 540-CLARKSBURG (most recent first)
| Award | Recipient | Office | Net obligations | FY |
|---|---|---|---|---|
| VA24412P0613 | CUMMINS CROSSPOINT LLC | 540-CLARKSBURG | $12,472 | FY2012 |
Cite as: Glassbox VA record view · VA contract (USAspending / FPDS) · CONT_AWD_VA244P1274_3600_-NONE-_-NONE- · retrieved 2026-09-26.